Quick answers
What is Poly House for Smt Usha and Mehak Bindal?
Poly House for Smt Usha and Mehak Bindal is a proposed project in Adhoya Musalmanan, Barara, Ambala, Haryana. The site covers 1.9 acres.
Who is building it?
The applicant is Mehak Bindal.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Adhoya Musalmanan, Barara, Ambala, Haryana.
How big is it?
It has a stated cost of ₹50 lakh; a site of 1.9 acres and 220 m² of forest land.
When was it filed?
The application was filed on 19 Nov 2026.
Project details
| Status | Under forest review |
|---|---|
| Status since | 25 Nov 2026 |
| Application filed | 19 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mehak Bindal |
| Land area | 1.9 acres (0.8 ha) |
| Forest land | 220 m² |
| Project cost | ₹50 lakh |
| Village / locality | Adhoya Musalmanan |
| Taluk / tehsil | Barara |
| District | Ambala |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-03417 |
In context
52 applications in Ambala since January 2022 are in the same category (Other): 3 approved, 12 filed or under review, and 37 withdrawn, lapsed or rejected. At 1.9 acres, this one is smaller than 58% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Adhoya Musalmanan, Barara, Ambala, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sharma Education Society — lapsed, 1.3 km away
- Approach road to CHC Barara Distt Ambala — lapsed, 1.6 km away
- Drain and Laying Ipbs. M-40 Along Road From Railway Stn to Stp in Mc Barara… — lapsed, 2.6 km away
- RCC Naala and providing/laying of 80mm thick ISI M-40 IPBs on Berms from… — lapsed, 2.9 km away
- Construction of Drain in Limits of Mc Barara Ambala — lapsed, 3 km away
- Drain from Ravidass mandir to Main road in MC limit Barara Ambala — lapsed, 3.1 km away
- Project by Shree Shyam Ji Builders — lapsed, 5.3 km away
- Project by Shree Shyam Ji Builders — lapsed, 5.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.