Quick answers
What is this project?
Diversion of forest land for access to the Proposed Retail Outlet of Bharat Petroleum Corporation Ltd is an approved fuel station in Kesri, Ambala, Haryana. The site covers 0.4 acres.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 4 Apr 2025), as of 27 Nov 2026.
Where is it?
In Kesri, Ambala, Haryana.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0.4 acres and 580 m² of forest land.
When was it filed?
The application was filed on 27 Mar 2023.
Project details
| Official title | Diversion of forest land for access to the Proposed Retail Outlet of Bharat Petroleum Corporation Ltd. at village Kesri on Dubli- Kesri Road at RDKM 04.690-04.725 (LHS) Tehsil and Distt. Ambala , Haryana, Khasra No. 50//11 |
|---|---|
| Status | Forest land use approved |
| Status since | 4 Apr 2025 |
| Application filed | 27 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 1,800 m² |
| Forest land | 580 m² |
| Project cost | ₹50 lakh |
| Village / locality | Kesri |
| Taluk / tehsil | Ambala |
| District | Ambala |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-01863 |
In context
29 applications in Ambala since January 2022 are in the same category (Fuel stations): 14 approved, 3 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 0.4 acres, this one is smaller than 72% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kesri, Ambala, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of forest land for underground Laying of 63mm MDPE HPOIL GAS… — lapsed, 1 km away
- NDK Global Logistics Park LLP — lapsed, 1.2 km away
- Industrial project by M/s S Cleantech Renewables Private Limited — lapsed, 1.9 km away
- Industrial project by LApyramid Hospitalities Pvt Ltd — lapsed, 2.2 km away
- Public facility by LAPyramid Hospitalities Pvt Ltd — lapsed, 2.2 km away
- Project by Shivalik Green Energy Pvt Ltd — more information requested, 3.9 km away
- Approach road to Industrial Unit of Abhinav Jain — more information requested, 4.4 km away
- Industrial project by SCW Infrabuild Private Limited — lapsed, 4.5 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Ambala
- New Retail Outlet of BPCL at Garnala Distt Ambala — forest land use approved
- Retail outlet at Garnala Distt Ambala — lapsed
- Diversion of forest land for access to the Proposed Retatil Outlet of Bharat… — forest land use approved
- New Retail Outlet of BPCL at Mohra Distt Ambala — forest land use approved
- New Retail Outlet of BPCL at Mohra Distt Ambala — lapsed
- Retail out let at Majri Distt Ambala — lapsed
13 Bharat Petroleum Corporation (BPCL) projects in Ambala
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.