Quick answers
What is this project?
Diversion of forest land for underground Laying of 63mm MDPE HPOIL GAS Pipeline along Chudiala -Kesri Road from Aadesh Hospital to Pyramid Eats near Village - Kesri is a lapsed pipeline project in Kesri, Ambala, Haryana. The site covers 1.1 acres.
Who is building it?
The applicant is Hpoil Gas Private Limited.
Has it been approved?
No. The application was lapsed on 16 Oct 2026, so it is no longer under consideration.
Where is it?
In Kesri, Ambala, Haryana.
How big is it?
It has a stated cost of ₹30 lakh; a site of 1.1 acres and 1.1 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 9 Sept 2026.
Project details
| Official title | Diversion of forest land for underground Laying of 63mm MDPE HPOIL GAS Pipeline along Chudiala -Kesri Road from Aadesh Hospital to Pyramid Eats near Village - Kesri in District – Ambala (HR). |
|---|---|
| Status | Lapsed |
| Status since | 16 Oct 2026 |
| Application filed | 9 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Hpoil Gas Private Limited |
| Land area | 1.1 acres (0.5 ha) |
| Forest land | 1.1 acres (0.5 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Kesri |
| Taluk / tehsil | Ambala |
| District | Ambala |
| State | Haryana |
| Location from | Site area on record |
| Our reference | WID-HR-02150 |
In context
10 applications in Ambala since January 2022 are in the same category (Pipelines): 1 approved, 1 filed or under review, and 8 withdrawn, lapsed or rejected. At 1.1 acres, this one is larger than 50% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kesri, Ambala, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- NDK Global Logistics Park LLP — lapsed, 350 m away
- Industrial project by M/s S Cleantech Renewables Private Limited — lapsed, 850 m away
- Diversion of forest land for access to the Proposed Retail Outlet of Bharat… — forest land use approved, 1 km away
- Industrial project by LApyramid Hospitalities Pvt Ltd — lapsed, 3 km away
- Public facility by LAPyramid Hospitalities Pvt Ltd — lapsed, 3 km away
- Industrial project by SCW Infrabuild Private Limited — lapsed, 3.5 km away
- Access Permission for Proposed Retail Outlet on Delhi-Ambala Road New NH-44… — lapsed, 3.6 km away
- Project by Shivalik Green Energy Pvt Ltd — more information requested, 3.7 km away
More from Hpoil Gas Private Limited in Ambala
- Diversion of forest land for Laying of underground 4-Inch HPOIL GAS Pipeline… — lapsed
- Diversion of forest land for Laying of 4-Inch HPOIL GAS Pipeline from NH 444A… — in-principle approval, conditions pending
- Laying of HPOIL GAS Pipeline from DAV School to Police Line Chowk, Arya Chowk… — forest land use approved
4 Hpoil Gas projects in Ambala
All 8 Hpoil Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.