Quick answers
What is this project?
Diversion of Forest Land for Construction of 3.00 Meter wide Concrete Street from Village – Godam to Village- Dharri, Tehsil – Kalka, Distt. – Panchkula is a lapsed road project in Thana Ki Ser, Kalka, Panchkula, Haryana. The site covers 1 acre.
Who is building it?
The applicant is Gram Panchayat - Thane Ki Ser.
Has it been approved?
No. The application was lapsed on 2 Sept 2025, so it is no longer under consideration.
Where is it?
In Thana Ki Ser, Kalka, Panchkula, Haryana.
How big is it?
It has a stated cost of ₹30 lakh; a site of 1 acre and 950 m² of forest land.
When was it filed?
The application was filed on 16 Jul 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 Sept 2025 |
| Application filed | 16 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Gram Panchayat - Thane Ki Ser |
| Land area | 1 acres (0.4 ha) |
| Forest land | 950 m² |
| Project cost | ₹30 lakh |
| Village / locality | Thana Ki Ser |
| Taluk / tehsil | Kalka |
| District | Panchkula |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-02106 |
In context
20 applications in Panchkula since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 14 withdrawn, lapsed or rejected. At 1 acre, this one is smaller than 70% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Thana Ki Ser, Kalka, Panchkula, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- City Gas Distribution Project — lapsed, 3.4 km away
- Diversion of Forest Land for access to approach road to the Proposed Site of… — more information requested, 3.9 km away
- Diversion of Forest Land for access to approach road to the Proposed Site of… — lapsed, 3.9 km away
- Diversion of Forest Land for improvement of L/R Kalka Paploha Kheranwali Road — lapsed, 4.1 km away
- Diversion of Forest Land for approach access to Proposed Site of Retail Outlet… — lapsed, 4.4 km away
- Baswal-Khera Boulder,Gravel and Sand Mining Project — under environmental review, 6.2 km away
- Baswal-Khera Boulder,Gravel and Sand Mining Project — cleared for impact study, 6.2 km away
- diversion of forest land 0.0201Ha. for access to HPCL Retail Outlet on Pinjore… — forest land use approved, 6.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.