Quick answers
What is this project?
Diversion of Forest Land for Widening and Strengthening of L/R Pinjore Mallah to Village Mallah Road in Distt. - Panchkula (HR) is a lapsed road project in Malla, Kalka, Panchkula, Haryana. The site covers 0.6 acres.
Who is building it?
The applicant is Provincial Division Pwd R&d Panchkula.
Has it been approved?
No. The application was lapsed on 14 Mar 2024, so it is no longer under consideration.
Where is it?
In Malla, Kalka, Panchkula, Haryana.
How big is it?
It has a stated cost of ₹79 lakh; a site of 0.6 acres and 1,660 m² of forest land.
When was it filed?
The application was filed on 29 Oct 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Mar 2024 |
| Application filed | 29 Oct 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Provincial Division Pwd R&d Panchkula |
| Land area | 2,600 m² |
| Forest land | 1,660 m² |
| Project cost | ₹79 lakh |
| Village / locality | Malla |
| Taluk / tehsil | Kalka |
| District | Panchkula |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-03164 |
In context
20 applications in Panchkula since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 14 withdrawn, lapsed or rejected. At 0.6 acres, this one is smaller than 85% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Malla, Kalka, Panchkula, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Widening and Strengthening of Link Road from… — lapsed, 2.3 km away
- Connectivity of our agricultural Land having Khasra No. – 91, 92, and 286… — lapsed, 4.3 km away
- Diversion of Forest Land for Approach Access to Proposed Site for the… — more information requested, 4.5 km away
- Diversion of 0.0046 Ha of Forest Land for Access to Approach Road From the… — lapsed, 4.5 km away
- Diversion of Forest Land for Widening & Strengthening of Link Road… — lapsed, 4.7 km away
- Diversion of Forest Land for Access to Approach Road From the Proposed Site of… — lapsed, 5.2 km away
- Diversion of forest Land for approach access to Agriculture Land — lapsed, 6.2 km away
- Proposed Integrated Residential Plotted Development project in the revenue… — application filed, 6.6 km away
More from Provincial Division Pwd R&d Panchkula in Panchkula
- Diversion of Forest Land for Construction of Link Road from Nimbwala to Dhandeon — more information requested
- Diversion of Forest Land for improvement of L/R Kalka Paploha Kheranwali Road — lapsed
- Diversion of Forest Land for the widening and strengthening of 2-Lane to… — lapsed
- Diversion of Forest Land for Widening and Strengthening of Link Road from… — lapsed
- Diversion of Forest Land for Widening & Strengthening of Link Road… — lapsed
- Diversion of 1.3667 Ha. Forest Land for the widening and strengthening of… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.