Quick answers
What is this project?
Diversion of Forest Land for Widening & Strengthening of Link Road Bhawana-Naulta Road in Dakrog in Panchkula in Distt. – Panchkula (HR) is a lapsed road project in Dakrog, Kalka, Panchkula, Haryana. The site covers 40.2 acres.
Who is building it?
The applicant is Provincial Division Pwd R&d Panchkula.
Has it been approved?
No. The application was lapsed on 20 Feb 2024, so it is no longer under consideration.
Where is it?
In Dakrog, Kalka, Panchkula, Haryana.
How big is it?
It has a stated cost of ₹3.8 crore; a site of 40.2 acres and 29.9 acres (12.1 ha) of forest land.
When was it filed?
The application was filed on 28 Oct 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Feb 2024 |
| Application filed | 28 Oct 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Provincial Division Pwd R&d Panchkula |
| Land area | 40.2 acres (16.3 ha) |
| Forest land | 29.9 acres (12.1 ha) |
| Project cost | ₹3.8 crore |
| Village / locality | Dakrog |
| Taluk / tehsil | Kalka |
| District | Panchkula |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-04869 |
In context
20 applications in Panchkula since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 14 withdrawn, lapsed or rejected. At 40.2 acres, this one is larger than 95% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dakrog, Kalka, Panchkula, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Widening and Strengthening of Link Road from… — lapsed, 2.8 km away
- Connectivity of our agricultural Land having Khasra No. – 91, 92, and 286… — lapsed, 3.5 km away
- Diversion of 0.0046 Ha of Forest Land for Access to Approach Road From the… — lapsed, 3.5 km away
- Diversion of Forest Land for Widening and Strengthening of L/R Pinjore Mallah… — lapsed, 4.7 km away
- Diversion of Forest Land for Approach Access to Proposed Site for the… — more information requested, 5.2 km away
- Diversion of Forest Land for the widening and strengthening of 2-Lane to… — lapsed, 6.1 km away
- diversion of forest land 0.0201Ha. for access to HPCL Retail Outlet on Pinjore… — forest land use approved, 6.2 km away
- Bsnl Rehabilitation Optical Fiber Cable From Himshikha to Pinjore — more information requested, 6.4 km away
More from Provincial Division Pwd R&d Panchkula in Panchkula
- Diversion of Forest Land for Construction of Link Road from Nimbwala to Dhandeon — more information requested
- Diversion of Forest Land for improvement of L/R Kalka Paploha Kheranwali Road — lapsed
- Diversion of Forest Land for the widening and strengthening of 2-Lane to… — lapsed
- Diversion of Forest Land for Widening and Strengthening of Link Road from… — lapsed
- Diversion of Forest Land for Widening and Strengthening of L/R Pinjore Mallah… — lapsed
- Diversion of 1.3667 Ha. Forest Land for the widening and strengthening of… — lapsed