What is Developing? Open the mapMap

In-principle approval, conditions pendingPipelines · Ambala, Haryana

Diversion of forest land for Laying of 4-Inch HPOIL GAS Pipeline from NH 444A to Glassco Laboratory Equipments Pvt. Ltd

Diversion of forest land for Laying of 4-Inch HPOIL GAS Pipeline from NH 444A to Glassco Laboratory Equipments Pvt. Ltd is a proposed pipeline project in Manglai, Ambala, Haryana. The site covers 0.7 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “In-principle approval, conditions pending” (since 30 May 2024).

See it on the live map All projects in Ambala

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of forest land for Laying of 4-Inch HPOIL GAS Pipeline from NH 444A to Glassco Laboratory Equipments Pvt. Ltd is a proposed pipeline project in Manglai, Ambala, Haryana. The site covers 0.7 acres.

Who is building it?

The applicant is Hpoil Gas Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.

Where is it?

In Manglai, Ambala, Haryana.

How big is it?

It has a stated cost of ₹50 lakh; a site of 0.7 acres and 2,690 m² of forest land.

When was it filed?

The application was filed on 27 Oct 2023.

Project details

Official titleDiversion of forest land for Laying of 4-Inch HPOIL GAS Pipeline from NH 444A to Glassco Laboratory Equipments Pvt. Ltd., situated in Village - Manglai and NH 444A to Omsons Glassware Pvt. Ltd., situated in Village - Sapehra in Distt. Ambala (HR)
StatusIn-principle approval, conditions pending
Status since30 May 2024
Application filed27 Oct 2023
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantHpoil Gas Private Limited
Land area2,700 m²
Forest land2,690 m²
Project cost₹50 lakh
Village / localityManglai
Taluk / tehsilAmbala
DistrictAmbala
StateHaryana
Location fromSite boundary on record
Our referenceWID-HR-03806

In context

10 applications in Ambala since January 2022 are in the same category (Pipelines): 1 approved, 1 filed or under review, and 8 withdrawn, lapsed or rejected. At 0.7 acres, this one is smaller than 60% of them.

22 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Manglai, Ambala, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Hpoil Gas Private Limited in Ambala

4 Hpoil Gas projects in Ambala
All 8 Hpoil Gas projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.