Quick answers
What is this project?
Diversion of Forest Land for approach access to Proposed Site for setting up of Industrial Unit on Raipur Rani – Trilokpur Road is a lapsed industrial project in Qasampur (251), Panchkula, Haryana. The site covers 0.8 acres.
Who is building it?
The applicant is Mohit Goyal.
Has it been approved?
No. The application was lapsed on 11 Sept 2026, so it is no longer under consideration.
Where is it?
In Qasampur (251), Panchkula, Haryana.
How big is it?
It has a stated cost of ₹75 lakh; a site of 0.8 acres and 70 m² of forest land.
When was it filed?
The application was filed on 11 Aug 2026.
Project details
| Official title | Diversion of Forest Land for approach access to Proposed Site for setting up of Industrial Unit on Raipur Rani – Trilokpur Road situated in Village - Kazampur, Tehsil - Raipur Rani, Distt. - Panchkula (HR) |
|---|---|
| Status | Lapsed |
| Status since | 11 Sept 2026 |
| Application filed | 11 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Industry |
| Applicant | Mohit Goyal |
| Land area | 3,100 m² |
| Forest land | 70 m² |
| Project cost | ₹75 lakh |
| Village / locality | Qasampur (251) |
| Taluk / tehsil | Panchkula |
| District | Panchkula |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-03821 |
In context
26 applications in Panchkula since January 2022 are in the same category (Industry): 16 approved, 2 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 0.8 acres, this one is smaller than 85% of them.
32 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Qasampur (251), Panchkula, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sharde Glass Industries Private Limited Along Trilokpur to Raipur Rani Road… — lapsed, 50 m away
- Diversion of Forest Land for access to approach road to the Proposed Site of… — forest land use approved, 50 m away
- Diversion of Forest Land for access to approach road to the Proposed Site of… — lapsed, 150 m away
- Diversion of Forest Land for access to approach road to the Proposed Site for… — lapsed, 150 m away
- Mohit Goyal — lapsed, 150 m away
- Diversion of forest land for Construction of 11KV Electric Line from 66KV Sub… — forest land use approved, 1.1 km away
- Diversion of forest land for Construction of 25KV Electric Line from 66KV Sub… — lapsed, 1.1 km away
- Diversion of Forest Land for approach access to Proposed Site of SK TRADERS on… — forest land use approved, 1.4 km away
More from Mohit Goyal in Panchkula
- Mohit Goyal — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.