Quick answers
What is National institute of Design?
National institute of Design is a lapsed project in Umri, Thanesar, Kurukshetra, Haryana. The site covers 20.7 acres.
Who is building it?
The applicant is National Institute of Design.
Has it been approved?
No. The application was lapsed on 27 Oct 2026, so it is no longer under consideration.
Where is it?
In Umri, Thanesar, Kurukshetra, Haryana.
How big is it?
It has a stated cost of ₹94 lakh; a site of 20.7 acres and 480 m² of forest land.
When was it filed?
The application was filed on 14 Feb 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 27 Oct 2026 |
| Application filed | 14 Feb 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | National Institute of Design |
| Land area | 20.7 acres (8.4 ha) |
| Forest land | 480 m² |
| Project cost | ₹94 lakh |
| Village / locality | Umri |
| Taluk / tehsil | Thanesar |
| District | Kurukshetra |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-04487 |
In context
33 applications in Kurukshetra since January 2022 are in the same category (Other): 7 approved, 3 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 17 months from filing to approval. At 20.7 acres, this one is larger than 91% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Umri, Thanesar, Kurukshetra, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project by Shri Sai Smaran Associates — lapsed, 350 m away
- Diversion of the Forest Land to Improve the Efficiency of the Corridor (NH-44)… — lapsed, 3 km away
- CONSTRUCTION BUILDINGS INFRASTRUCTURES AND OTHER FOR SHRI KRISHNA AYUSH… — environmental approval granted, 3.3 km away
- Construction Buildings infrastructures And Other For Shri Krishna Ayush… — withdrawn, 3.3 km away
- Industrial project by M/s Amba Agro India Private Limited — forest land use approved, 3.9 km away
- Diversion of forest land for underground Laying of 4-Inch HPOIL GAS Pipeline… — more information requested, 5.1 km away
- Re-Diversion of Forest Land of 0.87ha. for Improvement of Saharanpur -… — lapsed, 5.6 km away
- Project by M/s Aamulyum Homes Realtors Private Limited — lapsed, 5.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.