Quick answers
What is Industrial project by M/s Amba Agro India Private Limited?
This approved industrial project by M/s Amba Agro India Private Limited is in Amin (33), Thanesar, Kurukshetra, Haryana. The site covers 3.2 acres.
Who is building it?
The applicant is Amba Agro India Private Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 18 Apr 2025), as of 27 Nov 2026.
Where is it?
In Amin (33), Thanesar, Kurukshetra, Haryana.
How big is it?
It has a stated cost of ₹3 crore; a site of 3.2 acres and 560 m² of forest land.
When was it filed?
The application was filed on 7 Jan 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 18 Apr 2025 |
| Application filed | 7 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Industry |
| Applicant | Amba Agro India Private Limited |
| Land area | 3.2 acres (1.3 ha) |
| Forest land | 560 m² |
| Project cost | ₹3 crore |
| Village / locality | Amin (33) |
| Taluk / tehsil | Thanesar |
| District | Kurukshetra |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-04778 |
In context
17 applications in Kurukshetra since January 2022 are in the same category (Industry): 5 approved, 1 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3.2 acres, this one is larger than 59% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amin (33), Thanesar, Kurukshetra, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- National institute of Design — lapsed, 3.9 km away
- Project by Shri Sai Smaran Associates — lapsed, 4 km away
- CONSTRUCTION BUILDINGS INFRASTRUCTURES AND OTHER FOR SHRI KRISHNA AYUSH… — environmental approval granted, 4.4 km away
- Construction Buildings infrastructures And Other For Shri Krishna Ayush… — withdrawn, 4.4 km away
- Diversion of the Forest Land to Improve the Efficiency of the Corridor (NH-44)… — lapsed, 7 km away
- Diversion of forest land for underground Laying of 4-Inch HPOIL GAS Pipeline… — more information requested, 7.5 km away
- Re-Diversion of Forest Land of 0.87ha. for Improvement of Saharanpur -… — lapsed, 9.3 km away
- New Retail Outlet of BPCL at Village Kirmach Distt Kurukshetra — forest land use approved, 9.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.