Cleared for impact studyIndustry · Dhanbad, Jharkhand

Enhancement of MS Billet production from 27,000 TPA to 148,500 TPA through 3x15T Induction Furnaces (by replacing existing 1x9T Furnace with 1x15T & installing additional 2x15 T Furnaces

Enhancement of MS Billet production from 27,000 TPA to 148,500 TPA through 3x15T Induction Furnaces (by replacing existing 1x9T Furnace with 1x15T & installing additional 2x15 T Furnaces is a proposed industrial project in Kasitanr, Gobindpur, Dhanbad, Jharkhand. The site covers 4.5 acres. Its stated project cost is ₹49.1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 16 Mar 2023).

See it on the live map All projects in Dhanbad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Enhancement of MS Billet production from 27,000 TPA to 148,500 TPA through 3x15T…

Project details

Official titleEnhancement of MS Billet production from 27,000 TPA to 148,500 TPA through 3x15T Induction Furnaces (by replacing existing 1x9T Furnace with 1x15T & installing additional 2x15 T Furnaces along with CCM-1x2strand, 4/7 radius), and production of 145,500 TPA TMT Bars & Rolled Products by installing Rolling Mills of 1x25 TPH Capacity and reheating furnace of 30 TPH (emergency use) at Plot No C-13, C-15 & C-16, Village- Kansitanr, Thana No. 124, Thana-Govindpur, P.S.-Govindpur, District -Dhanbad,
StatusCleared for impact study
Status since16 Mar 2023
Application filed16 Mar 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantShree Dwarikesh Ecotex Private Limited
Land area4.5 acres (1.8 ha)
Project cost₹49.1 crore
Village / localityKasitanr
Taluk / tehsilGobindpur
DistrictDhanbad
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-00148

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 15 Oct 2023Environmental approval granted4.5 acres₹49.1 crore
Early planning filed 16 Mar 2023 (this page)Cleared for impact study4.5 acres₹49.1 crore

In context

13 applications in Dhanbad since January 2022 are in the same category (Industry): 10 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. At 4.5 acres, this one is smaller than 69% of them.

20 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kasitanr, Gobindpur, Dhanbad, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.