One of 3 filings for this project. The project's main page, with every filing and where each stands: Expansion of existing plant of 36000 TPA M.S. Billets/Ingots to a final configuration of…
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Oct 2023 |
| Application filed | 16 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Jai Prabhuji Iron & Steel Private Limited |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹66.2 crore |
| Village / locality | Kasitanr |
| Taluk / tehsil | Gobindpur |
| District | Dhanbad |
| State | Jharkhand |
| Location from | Site area on record |
| Our reference | WID-JH-00358 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 4 Jun 2026 | Environmental approval granted | 5.9 acres | ₹71.7 crore |
| Early planning filed 23 Nov 2023 | Cleared for impact study | 4.9 acres | ₹66.2 crore |
| Expansion filed 16 Oct 2023 (this page) | Environmental approval granted | 4.9 acres | ₹66.2 crore |
In context
13 applications in Dhanbad since January 2022 are in the same category (Industry): 10 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. At 4.9 acres, this one is smaller than 54% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kasitanr, Gobindpur, Dhanbad, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing plant of 36000 TPA M.S. Billets/Ingots to a final… — cleared for impact study, 0 m away
- Expansion of existing plant of 36000 TPA M.S. Billets/Ingots to a final… — environmental approval granted, 0 m away
- Enhancement of MS Billet production from 27,000 TPA to 148,500 TPA through… — environmental approval granted, 150 m away
- Enhancement of MS Billet production from 27,000 TPA to 148,500 TPA through… — cleared for impact study, 150 m away
- Environmental Clearance for Enhancing the production of MS Billets from… — more information requested, 300 m away
- Bd Alloys & Metals — lapsed, 700 m away
- Marro Stone Deposit — environmental approval granted, 2.3 km away
- Marro Stone Deposit — cleared for impact study, 2.3 km away