Project details
| Official title | Expansion of Sponge Iron Production of 90,000 TPA with 3x100 TPD DRI Kiln (1 Kiln under Violation) with addition of new manufacturing facility of Ferro Alloy Plant with Product Mix of Si-Mn (20,520 TPA) or Fe-Mn (25,566 TPA) or Fe-Si (11,140 TPA) with 2 x 6 MVA Submerged Arc Furnace along with Captive Power Plant of 14 MW (WHRB#6 MW & Coal Based#8 MW) at Mouza-Bandi Digdhu, Taluka/Mandal-Jhumri Telaiya, District-Koderma, Jharkhand by M/s Shivam Iron and Steel Company Limited. |
|---|---|
| Status | Cleared for impact study |
| Status since | 19 Sept 2023 |
| Application filed | 20 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Shivam Iron & Steel Co.Ltd. |
| Land area | 22.9 acres (9.3 ha) |
| Project cost | ₹172 crore |
| Village / locality | Bandidigthu |
| Taluk / tehsil | Chandwara |
| District | Kodarma |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00198 |
In context
17 applications in Kodarma since January 2022 are in the same category (Industry): 14 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 22.9 acres, this one is larger than 94% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bandidigthu, Chandwara, Kodarma, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Production of MS Billets 3,00,000 TPA through… — environmental approval granted, 800 m away
- Environmental Clearance for Production of MS Billets 3,00,000 TPA through… — cleared for impact study, 800 m away
- Environment Clearance of Existing Unit of M/S Mohit Ventures Private Limited,… — environmental approval granted, 1000 m away
- Environmental Clearance of Proposed production capacity 2,64,000 TPA of MS… — cleared for impact study, 1.6 km away
- Environmental Clearance of Proposed production capacity 2,64,000 TPA of MS… — environmental approval granted, 1.6 km away
- Industrial project by M/s JKI Infrastructure Pvt. Ltd. at Mauza- Barwadih,… — environmental approval granted, 1.8 km away
- Industrial project by M/s JKI Infrastructure Pvt. Ltd. at Mauza- Barwadih,… — cleared for impact study, 1.8 km away
- PROPOSED PRODUCTION CAPACITY OF THE M.S. BILLETS IS ~500 MT/DAY (1,50,000 TPA)… — environmental approval granted, 1.9 km away
All 4 Shivam Iron & Steel Co projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.