Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 May 2023 |
| Application filed | 20 May 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Jki Infrastructure Private Limited |
| Land area | 7.9 acres (3.2 ha) |
| Project cost | ₹98 crore |
| Village / locality | Jhumri Tilaiya |
| Taluk / tehsil | Koderma |
| District | Kodarma |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00391 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 20 May 2023 (this page) | Environmental approval granted | 7.9 acres | ₹98 crore |
| Early planning filed 8 Nov 2022 | Cleared for impact study | 7.9 acres | ₹98 crore |
In context
17 applications in Kodarma since January 2022 are in the same category (Industry): 14 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.9 acres, this one is larger than 71% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jhumri Tilaiya, Koderma, Kodarma, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s JKI Infrastructure Pvt. Ltd. at Mauza- Barwadih,… — cleared for impact study, 0 m away
- PROPOSED PRODUCTION CAPACITY OF THE M.S. BILLETS IS ~500 MT/DAY (1,50,000 TPA)… — environmental approval granted, 150 m away
- Environmental Clearance of Proposed production capacity 2,64,000 TPA of MS… — cleared for impact study, 400 m away
- Environmental Clearance of Proposed production capacity 2,64,000 TPA of MS… — environmental approval granted, 400 m away
- Proposed project for Enhancement of MS Billet Production From 15,000 TPA to… — environmental approval granted, 750 m away
- Proposed project for Enhancement of MS Billet Production From 15,000 TPA to… — cleared for impact study, 750 m away
- Environment Clearance of Existing Unit of M/S Mohit Ventures Private Limited,… — environmental approval granted, 850 m away
- 132 KV D/C From KTPS GSS to Gajhandi TSS Transmission Line — more information requested, 900 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.