One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Petroleum Products From 34,080 Tpa to 1,21,800 Tpa at Plot No. 57&58, Khata…
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 17 Oct 2023 |
| Application filed | 26 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Kodarma Chemical Private Limited |
| Land area | 4.5 acres (1.8 ha) |
| Project cost | ₹10.3 crore |
| Village / locality | Jhumri Tilaiya |
| Taluk / tehsil | Koderma |
| District | Kodarma |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00202 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 5 Jul 2024 | Environmental approval granted | 4.5 acres | ₹10.3 crore |
| Expansion filed 26 Aug 2023 (this page) | Returned to applicant | 4.5 acres | ₹10.3 crore |
In context
17 applications in Kodarma since January 2022 are in the same category (Industry): 14 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.5 acres, this one is smaller than 65% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jhumri Tilaiya, Koderma, Kodarma, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Petroleum Products From 34,080 Tpa to 1,21,800 Tpa at Plot No.… — environmental approval granted, 0 m away
- Greenfield 100,000 TPA Coal Tar Distillation Plant for production of 54,000… — environmental approval granted, 350 m away
- Greenfield 100,000 TPA Coal Tar Distillation Plant for production of 54,000… — cleared for impact study, 350 m away
- Proposed project for Enhancement of MS Billet Production From 15,000 TPA to… — environmental approval granted, 850 m away
- Proposed project for Enhancement of MS Billet Production From 15,000 TPA to… — cleared for impact study, 850 m away
- 132 KV D/C From KTPS GSS to Gajhandi TSS Transmission Line — more information requested, 1.4 km away
- Environmental Clearance of Proposed production capacity 2,64,000 TPA of MS… — cleared for impact study, 1.4 km away
- Environmental Clearance of Proposed production capacity 2,64,000 TPA of MS… — environmental approval granted, 1.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.