Quick answers
What is this project?
Production of 33,412 TPA Granite gneiss through mechanized opencast mining method with maximum excavation of 35,822.2 TPA spread over 2.85 acres (1.15 ha.) in Mouza – Taranga, Thana – Chandrapura, Thana No. – 102, District – Bokaro, State Jharkhand for M/s Maa Tara Stone Mines is an approved mining project in Taranga, Chandrapura, Bokaro, Jharkhand. The site covers 2.8 acres.
Who is building it?
The applicant is Tapesh Pandey.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Aug 2023), as of 27 Nov 2026.
Where is it?
In Taranga, Chandrapura, Bokaro, Jharkhand.
How big is it?
It has a stated cost of ₹1 crore and a site of 2.8 acres.
When was it filed?
The application was filed on 16 Aug 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Aug 2023 |
| Application filed | 16 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Tapesh Pandey |
| Land area | 2.8 acres (1.2 ha) |
| Project cost | ₹1 crore |
| Village / locality | Taranga |
| Taluk / tehsil | Chandrapura |
| District | Bokaro |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00343 |
In context
93 applications in Bokaro since January 2022 are in the same category (Mining): 76 approved, 3 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 41 days from filing to approval. At 2.8 acres, this one is smaller than 88% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Taranga, Chandrapura, Bokaro, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Telo Stone Mines — environmental approval granted, 5.2 km away
- Telo Stone Mines — environmental approval granted, 5.2 km away
- Prasbani Stone Mine — environmental approval granted, 5.9 km away
- Dugda Coking Coal Washery of 6.0 MTPA capacity by M/s JSW Steel Limited — under environmental review, 6.2 km away
- Dugda Coking Coal Washery of 6 MTPA capacity by M/s JSW Steel Limited — withdrawn, 6.2 km away
- Dugda NLW Coal Washery of 2.5 MTPA — environmental approval granted, 6.4 km away
- Proposed Expansion by addition of 2x800 MW Coal Based Thermal Power Units to… — returned to applicant, 6.9 km away
- LILO of 132 KV Chandankyari - Jainamore Transmission Line at Dugda — in-principle approval, conditions pending, 10 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.