Enhancement of production capacity from 250,000MTPA (1,00,000TPA Metal Coated Coil & 150,000TPA Colour Coated Coil) to 280,000TPA (1,15,000TPA Metal Coated Coil & 165,000TPA Colour Coated Coil) through change in raw material and process optimization under No Increase of Pollution Load by M/s Tata BlueScope Steels Pvt Ltd at Bara, East Singhbhum, Jharkhand

Enhancement of production capacity from 250,000MTPA (1,00,000TPA Metal Coated Coil & 150,000TPA Colour Coated Coil) to 280,000TPA (1,15,000TPA Metal Coated Coil & 165,000TPA Colour Coated Coil) through change in raw material and process optimization under No Increase of Pollution Load by M/s Tata BlueScope Steels Pvt Ltd at Bara, East Singhbhum, Jharkhand is a proposed industrial project in Bara, Golmuri-Cum-Jugsalai, Purbi Singhbhum, Jharkhand. The site covers 59.3 acres. Its stated project cost is ₹785 crore. As of 27 Nov 2026, its status is “Initial checks” (since 13 Feb 2024).

See it on the live map All projects in Purbi Singhbhum

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Enhancement of production capacity from 250,000MTPA (1,00,000TPA Metal Coated Coil & 150,000TPA Colour Coated Coil) to 280,000TPA (1,15,000TPA Metal Coated Coil & 165,000TPA Colour Coated Coil) through change in raw material and process optimization under No Increase of Pollution Load by M/s Tata BlueScope Steels Pvt Ltd at Bara, East Singhbhum, Jharkhand is a proposed industrial project in Bara, Golmuri-Cum-Jugsalai, Purbi Singhbhum, Jharkhand. The site covers 59.3 acres.

Who is building it?

The applicant is Tata Bluescope Steel Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Bara, Golmuri-Cum-Jugsalai, Purbi Singhbhum, Jharkhand.

How big is it?

It has a stated cost of ₹785 crore and a site of 59.3 acres.

When was it filed?

The application was filed on 13 Feb 2024.

Project details

StatusInitial checks
Status since13 Feb 2024
Application filed13 Feb 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantTata Bluescope Steel Private Limited
Land area59.3 acres (24 ha)
Project cost₹785 crore
Village / localityBara
Taluk / tehsilGolmuri-Cum-Jugsalai
DistrictPurbi Singhbhum
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-00850

In context

25 applications in Purbi Singhbhum since January 2022 are in the same category (Industry): 17 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 59.3 acres, this one is smaller than 68% of them.

14 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bara, Golmuri-Cum-Jugsalai, Purbi Singhbhum, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.