Quick answers
What is this project?
Operation of Current Plant of Capacity 415,000 Tpa and Proposed Phase-Wise Expansion to 1,015,000 Tpa Capacity of Electrolytic Tinplateand Tin-Free Steel Material Including 28,000 Tpa Printed and Lacquered Sheets at Golmuri Works, Jamshedpur, East Singhbhum, Jharkhand is a lapsed industrial project in Jamshedpur, Golmuri-Cum-Jugsalai, Purbi Singhbhum, Jharkhand. The site covers 133.3 acres.
Who is building it?
The applicant is The Tinplate Company of India Limited.
Has it been approved?
No. The application was lapsed on 19 May 2025, so it is no longer under consideration.
Where is it?
In Jamshedpur, Golmuri-Cum-Jugsalai, Purbi Singhbhum, Jharkhand.
How big is it?
It has a stated cost of ₹4,145.8 crore and a site of 133.3 acres.
When was it filed?
The application was filed on 28 Jun 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Operation of Current Plant of Capacity 415,000 Tpa and Proposed Phase-Wise Expansion to…
Project details
| Status | Lapsed |
|---|---|
| Status since | 19 May 2025 |
| Application filed | 28 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | The Tinplate Company of India Limited |
| Land area | 133.3 acres (53.9 ha) |
| Project cost | ₹4,145.8 crore |
| Village / locality | Jamshedpur |
| Taluk / tehsil | Golmuri-Cum-Jugsalai |
| District | Purbi Singhbhum |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-01057 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 28 Jun 2024 (this page) | Lapsed | 133.3 acres | ₹4,145.8 crore |
| Ownership transfer filed 24 Jun 2024 | Environmental approval granted | 133.3 acres | ₹4,145.8 crore |
| Expansion filed 16 Nov 2023 | Environmental approval granted | 133.3 acres | ₹4,145.8 crore |
In context
25 applications in Purbi Singhbhum since January 2022 are in the same category (Industry): 17 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 133.3 acres, this one is larger than 76% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jamshedpur, Golmuri-Cum-Jugsalai, Purbi Singhbhum, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Operation of Current Plant of Capacity 415,000 Tpa and Proposed Phase-Wise… — environmental approval granted, 0 m away
- Operation of Current Plant of Capacity 415,000 Tpa and Proposed Phase-Wise… — environmental approval granted, 0 m away
- Manipal Tata Medical College (MTMC)by Manipal Academy of Higher Education (MAHE) — environmental approval granted, 1.9 km away
- Transfer of EC (EC identification no. EC23B008JH110673 & File no.… — environmental approval granted, 2.3 km away
- Expansion of existing Rebars & Wire Rods at Wire Rod Mill from capacity… — environmental approval granted, 2.3 km away
- Expansion of existing Rebars & Wire Rods at Wire Rod Mill from capacity… — cleared for impact study, 2.3 km away
- Name Change (Transfer) of the Environment Clearance (EC File no.… — environmental approval granted, 2.4 km away
- Enhancement of production capacity from 250,000MTPA (1,00,000TPA Metal Coated… — initial checks, 2.4 km away
All 3 The Tinplate Company of India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.