Quick answers
What is this project?
Grain based Distillery to produce Ethanol with installed capacity 40 KLPD under 100% EBP program by M/s Maheshwari Carbons Private Limited at Mouza–Nawadih, P.S.- Sariakella, Thana No-292, Halka No - 8, Khata No-43, Plot No.-402 (P), Jharkhand – 833 219 is a proposed industrial project in Chandanpur, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 3 acres.
Who is building it?
The applicant is Maheshwari Carbons Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 22 Jan 2025), as of 27 Nov 2026.
Where is it?
In Chandanpur, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand.
How big is it?
It has a stated cost of ₹44 crore and a site of 3 acres.
When was it filed?
The application was filed on 11 Dec 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Grain based Distillery to produce Ethanol with installed capacity 40 KLPD under 100% EBP…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 22 Jan 2025 |
| Application filed | 11 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Maheshwari Carbons Private Limited |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹44 crore |
| Village / locality | Chandanpur |
| Taluk / tehsil | Adityapur(Gamharia) |
| District | Saraikela-Kharsawan |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00853 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Jun 2025 | Environmental approval granted | 3 acres | ₹44 crore |
| Early planning filed 11 Dec 2024 (this page) | Cleared for impact study | 3 acres | ₹44 crore |
| Early planning filed 2 Dec 2024 | Lapsed | 3 acres | ₹44 crore |
In context
47 applications in Saraikela-Kharsawan since January 2022 are in the same category (Industry): 24 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3 acres, this one is smaller than 100% of them.
Where it is
Chandanpur, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Grain based Distillery to produce Ethanol with installed capacity 40 KLPD… — environmental approval granted, 0 m away
- Grain based Distillery to produce Ethanol with installed capacity 40 KLPD… — lapsed, 0 m away
- Chota Tangrani Stone Mine — environmental approval granted, 5.1 km away
- Bhandari Sai Quartzite Stone Mine — environmental approval granted, 5.2 km away
- Chhota Tangrani Stone Deposit, Mauza- Chhota Tangrani, P.S.- Saraikela, Thana… — environmental approval granted, 5.3 km away
- Joddiha Stone Mine — environmental approval granted, 6.1 km away
- Inclusion of Common Bio-Medical Waste Treatment Facility in Hazardous Waste… — lapsed, 7.4 km away
- Inclusion of Common Bio-Medical Waste Treatment Facility in Hazardous Waste… — lapsed, 7.4 km away
All 3 Maheshwari Carbons projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.