Quick answers
What is this project?
Inclusion of Common Bio-Medical Waste Treatment Facility in Hazardous Waste Management Facility is a lapsed waste management project in Dugni, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 24 acres.
Who is building it?
The applicant is Adityapur Waste Management Private Limited.
Has it been approved?
No. The application was lapsed on 30 Dec 2024, so it is no longer under consideration.
Where is it?
In Dugni, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand.
How big is it?
It has a stated cost of ₹25 crore and a site of 24 acres.
When was it filed?
The application was filed on 18 Nov 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Inclusion of Common Bio-Medical Waste Treatment Facility in Hazardous Waste Management…
Project details
| Official title | Inclusion of Common Bio-Medical Waste Treatment Facility in Hazardous Waste Management Facility at Dugni- Village, Saraikela-Tehsil, Saraikela-Kharsawan-District, Jharkhand |
|---|---|
| Status | Lapsed |
| Status since | 30 Dec 2024 |
| Application filed | 18 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Waste management |
| Applicant | Adityapur Waste Management Private Limited |
| Land area | 24 acres (9.7 ha) |
| Project cost | ₹25 crore |
| Village / locality | Dugni |
| Taluk / tehsil | Adityapur(Gamharia) |
| District | Saraikela-Kharsawan |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00659 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 22 Mar 2025 | Lapsed | 24 acres | ₹25 crore |
| Ownership transfer filed 18 Nov 2024 (this page) | Lapsed | 24 acres | ₹25 crore |
In context
5 applications in Saraikela-Kharsawan since January 2022 are in the same category (Waste management): 0 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dugni, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Inclusion of Common Bio-Medical Waste Treatment Facility in Hazardous Waste… — lapsed, 0 m away
- Proposed Expansion of Common Hazardous Waste Treatment Storage and Disposal… — under environmental review, 0 m away
- Proposed Expansion of Common Hazardous waste Treatment Storage and Disposal… — under environmental review, 0 m away
- Integrated Common Hazardous Waste Treatment, Storage and Disposal Facility — lapsed, 50 m away
- Expansion of Srijan Steel and Power Industries Private Limited by Production… — lapsed, 1.4 km away
- Expansion of Srijan Steel and Power Industries Private Limited by Production… — cleared for impact study, 1.4 km away
- Proposed Modernization cum Expansion of Integrated Steel Plant with Sponge… — under environmental review, 2.3 km away
- Proposed Integrated Steel Plant with Sponge Iron (DRI) 2,31,000 TPA, Steel… — environmental approval granted, 2.3 km away
More from Adityapur Waste Management Private Limited in Saraikela-Kharsawan
- Integrated Common Hazardous Waste Treatment, Storage and Disposal Facility — lapsed
- Proposed Expansion of Common Hazardous Waste Treatment Storage and Disposal… — under environmental review
- Proposed Expansion of Common Hazardous waste Treatment Storage and Disposal… — under environmental review
All 5 Adityapur Waste Management projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.