What is this project?
Enhancement of existing steel plant and legitimizing violation units for total production of 643,500 TPA Sponge Iron, 199,500 TPA Billets, 165,000 TPA Rolled products, 65,000 TPA Ferro alloys (Max) by Shah Sponge and Power Ltd is a lapsed industrial project in Juri, Potka, Purbi Singhbhum, Jharkhand. The site covers 48.6 acres.
Who is building it?
The applicant is Shah Sponge & Power Limited.
Has it been approved?
No. The application was lapsed on 6 Mar 2026, so it is no longer under consideration.
Where is it?
In Juri, Potka, Purbi Singhbhum, Jharkhand.
How big is it?
It has a stated cost of ₹780.2 crore and a site of 48.6 acres.
When was it filed?
The application was filed on 12 Apr 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Enhancement of existing steel plant and legitimizing violation units for total…
Project details
| Official title | Enhancement of existing steel plant and legitimizing violation units for total production of 643,500 TPA Sponge Iron, 199,500 TPA Billets, 165,000 TPA Rolled products, 65,000 TPA Ferro alloys (Max) along with 70 MW Captive Power Plant at Village: Juri, P.O. Hata, Dist: East Singhbhum, Jharkhand State by Shah Sponge and Power Ltd |
|---|---|
| Status | Lapsed |
| Status since | 6 Mar 2026 |
| Application filed | 12 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Shah Sponge & Power Limited |
| Land area | 48.6 acres (19.7 ha) |
| Project cost | ₹780.2 crore |
| Village / locality | Juri |
| Taluk / tehsil | Potka |
| District | Purbi Singhbhum |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00909 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 12 Apr 2024 (this page) | Lapsed | 48.6 acres | ₹780.2 crore |
| Early planning filed 24 Apr 2023 | Cleared for impact study | 48.6 acres | ₹780.2 crore |
In context
25 applications in Purbi Singhbhum since January 2022 are in the same category (Industry): 17 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 48.6 acres, this one is smaller than 76% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Juri, Potka, Purbi Singhbhum, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Enhancement of existing steel plant and legitimizing violation units for total… — cleared for impact study, 0 m away
- Pauri Stone Mine (2.428 hectare or 6.00 Acres) — lapsed, 2.7 km away
- Pauri Stone Mine (Area 2.428ha.) — environmental approval granted, 2.7 km away
- Bara Bhumri Stone Deposit — environmental approval granted, 2.8 km away
- Bara Bhumri Stone Mine — environmental approval granted, 2.9 km away
- Sarmanda Stone Block — environmental approval granted, 3 km away
- Sarmanda Stone Block – A — environmental approval granted, 3.2 km away