Expansion-Cum-Modernization of Capacity of Existing Bar Mill From 105 Mt/Day to 425 Mt/Day is a withdrawn industrial project in Adityapur Municipality, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 8.1 acres.
Who is building it?
The applicant is Tata Steel Limited.
Has it been approved?
No. The application was withdrawn on 21 Apr 2024, so it is no longer under consideration.
Where is it?
In Adityapur Municipality, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand.
How big is it?
It has a stated cost of ₹15 crore and a site of 8.1 acres.
When was it filed?
The application was filed on 28 Feb 2024.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 21 Apr 2024 |
| Application filed | 28 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Tata Steel Limited |
| Land area | 8.1 acres (3.3 ha) |
| Project cost | ₹15 crore |
| Village / locality | Adityapur Municipality |
| Taluk / tehsil | Adityapur(Gamharia) |
| District | Saraikela-Kharsawan |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00973 |
In context
47 applications in Saraikela-Kharsawan since January 2022 are in the same category (Industry): 24 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.1 acres, this one is smaller than 79% of them.
33 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Adityapur Municipality, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Surrender of Environment Clearance "Modernization Cum Expansion of Straight… — more information requested, 0 m away
- Transfer of EC granted by SEIAA Jharkhand vide letter no.… — environmental approval granted, 0 m away
- Change in Product mix within approved capacity of 6000 TPA for inclusion of… — initial checks, 1.1 km away
- EC transfer of Expansion of existing iron and steel plant by installation of… — environmental approval granted, 1.5 km away
- Environmental Clearance for Modernization and Expansion of Facilities of… — under environmental review, 1.5 km away
- Diversion of Forest Land for Laying of 11 KV Underground Power Cables Along/… — lapsed, 1.8 km away
- Proposed project Group Housing "The Sapphire" by M/s Samay Homes Rep by Mr.… — environmental approval granted, 2.2 km away
- Environment Clearance for Mini Blast Furnace (3x40m3) for the production of… — more information requested, 2.4 km away
More from Tata Steel Limited in Saraikela-Kharsawan
- Surrender of Environment Clearance "Modernization Cum Expansion of Straight… — more information requested
- 0.5 MTPA Electrical Steel Complex — cleared for impact study
- EC transfer of Expansion of existing iron and steel plant by installation of… — environmental approval granted
- Transfer of EC granted by SEIAA Jharkhand vide letter no.… — environmental approval granted
5 Tata Steel projects in Saraikela-Kharsawan
All 104 Tata Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.