What is Developing? Open the mapMap

WithdrawnIndustry · Saraikela-Kharsawan, Jharkhand

Expansion-Cum-Modernization of Capacity of Existing Bar Mill From 105 Mt/Day to 425 Mt/Day

Expansion-Cum-Modernization of Capacity of Existing Bar Mill From 105 Mt/Day to 425 Mt/Day is a withdrawn industrial project in Adityapur Municipality, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 8.1 acres. Its stated project cost is ₹15 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 21 Apr 2024).

See it on the live map All projects in Saraikela-Kharsawan

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion-Cum-Modernization of Capacity of Existing Bar Mill From 105 Mt/Day to 425 Mt/Day is a withdrawn industrial project in Adityapur Municipality, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 8.1 acres.

Who is building it?

The applicant is Tata Steel Limited.

Has it been approved?

No. The application was withdrawn on 21 Apr 2024, so it is no longer under consideration.

Where is it?

In Adityapur Municipality, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand.

How big is it?

It has a stated cost of ₹15 crore and a site of 8.1 acres.

When was it filed?

The application was filed on 28 Feb 2024.

Project details

StatusWithdrawn
Status since21 Apr 2024
Application filed28 Feb 2024
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorIndustry
ApplicantTata Steel Limited
Land area8.1 acres (3.3 ha)
Project cost₹15 crore
Village / localityAdityapur Municipality
Taluk / tehsilAdityapur(Gamharia)
DistrictSaraikela-Kharsawan
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-00973

In context

47 applications in Saraikela-Kharsawan since January 2022 are in the same category (Industry): 24 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.1 acres, this one is smaller than 79% of them.

33 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Adityapur Municipality, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Tata Steel Limited in Saraikela-Kharsawan

5 Tata Steel projects in Saraikela-Kharsawan
All 104 Tata Steel projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.