Environmental approval grantedIndustry · Saraikela-Kharsawan, Jharkhand

EC transfer of Expansion of existing iron and steel plant by installation of Coke Oven Plant (0.5 MTPA), Iron Ore Washing (2.7 MTPA) and Pelletization Plant (1.2 MTPA)

EC transfer of Expansion of existing iron and steel plant by installation of Coke Oven Plant (0.5 MTPA), Iron Ore Washing (2.7 MTPA) and Pelletization Plant (1.2 MTPA) is an approved industrial project in Adityapur Municipality, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 390.4 acres. Its stated project cost is ₹4,238.2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 21 Nov 2024).

See it on the live map All projects in Saraikela-Kharsawan

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

EC transfer of Expansion of existing iron and steel plant by installation of Coke Oven Plant (0.5 MTPA), Iron Ore Washing (2.7 MTPA) and Pelletization Plant (1.2 MTPA) is an approved industrial project in Adityapur Municipality, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 390.4 acres.

Who is building it?

The applicant is Tata Steel Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 21 Nov 2024), as of 27 Nov 2026.

Where is it?

In Adityapur Municipality, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand.

How big is it?

It has a stated cost of ₹4,238.2 crore and a site of 390.4 acres.

When was it filed?

The application was filed on 24 Sept 2024.

Project details

StatusEnvironmental approval granted
Status since21 Nov 2024
Application filed24 Sept 2024
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorIndustry
ApplicantTata Steel Limited
Land area390.4 acres (158 ha)
Project cost₹4,238.2 crore
Village / localityAdityapur Municipality
Taluk / tehsilAdityapur(Gamharia)
DistrictSaraikela-Kharsawan
StateJharkhand
Location fromSite area on record
Our referenceWID-JH-00795

In context

47 applications in Saraikela-Kharsawan since January 2022 are in the same category (Industry): 24 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 390.4 acres, this one is larger than 83% of them.

30 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Adityapur Municipality, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Tata Steel Limited in Saraikela-Kharsawan

5 Tata Steel projects in Saraikela-Kharsawan
All 104 Tata Steel projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.