What is Developing? Open the mapMap

Under environmental reviewMining · Latehar, Jharkhand

Proposed Green Field Project To Set-up wet 2.5 MTPA coal Washery by M/s Omkar Coal Washeries Pvt Ltd

Proposed Green Field Project To Set-up wet 2.5 MTPA coal Washery by M/s Omkar Coal Washeries Pvt Ltd is a proposed mining project in Olhepat, Balumath, Latehar, Jharkhand. The site covers 138.7 acres. Its stated project cost is ₹29.3 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 2 Sept 2024).

See it on the live map All projects in Latehar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusUnder environmental review
Status since2 Sept 2024
Application filed2 Sept 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantOmkar Coal Washeries Private Limited
Land area138.7 acres (56.1 ha)
Project cost₹29.3 crore
Village / localityOlhepat
Taluk / tehsilBalumath
DistrictLatehar
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-01092

In context

76 applications in Latehar since January 2022 are in the same category (Mining): 47 approved, 17 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 138.7 acres, this one is larger than 68% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Olhepat, Balumath, Latehar, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Omkar Coal Washeries Private Limited in Latehar

All 4 Omkar Coal Washeries projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.