Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 27 Apr 2026 |
| Application filed | 21 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Omkar Coal Washeries Private Limited |
| Land area | 18.5 acres (7.5 ha) |
| Project cost | ₹29.3 crore |
| Village / locality | Olhepat |
| Taluk / tehsil | Balumath |
| District | Latehar |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00886 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 7 Apr 2026 | Environmental approval granted | 18.5 acres | ₹29.3 crore |
| Early planning filed 21 Oct 2024 (this page) | Cleared for impact study | 18.5 acres | ₹29.3 crore |
In context
76 applications in Latehar since January 2022 are in the same category (Mining): 47 approved, 17 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 18.5 acres, this one is larger than 62% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Olhepat, Balumath, Latehar, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Green Field Project to set-up wet 2.48 MTPA Coal Washery At Kh No… — environmental approval granted, 0 m away
- Brick Soil Mining For M/s Sona Bricks — initial checks, 5.7 km away
- Brick Soil Mining for M/s King Bricks — initial checks, 5.8 km away
- Brick Soil Mining for M/s Kita Bricks — under environmental review, 8.2 km away
- Brick Soil Mining For M/s S B Bricks — under environmental review, 8.8 km away
- North Dhadu ( Western Part ) Open Cast Coal Mine of 4.5 MTPA capacity in an… — under forest review, 9.1 km away
- North Dhadu ( Western Part ) Open Cast Coal Mine of 4.5 MTPA capacity in an… — cleared for impact study, 9.1 km away
- North Dhadu (Eastern Part) Coal Mining Project — returned to applicant, 9.9 km away
More from Omkar Coal Washeries Private Limited in Latehar
- Proposed Green Field Project to Set-up wet 2.48 MTPA Coal Washery at Plot… — under environmental review
- Proposed Green Field Project To Set-up wet 2.5 MTPA coal Washery by M/s Omkar… — under environmental review
All 4 Omkar Coal Washeries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.