Quick answers
What is this project?
Expansion in Production of sponge iron from 1,20,000 TPA to 1,44,000 TPA by adding of 1x80 TPD DRI unit and change in Technology from Induction Furnaces to Submerged Arc Furnaces (SAF) (12000 KVA*2) for the production of Fe-Si/ Fe-Mn/ Si-Mn/ Pig Iron -64,000 TPA M/s. Sri Venkatesh Iron & Alloys (India) Limited, Lapanga, Bhadaninagar, Ramgarh, Jharkhand is a lapsed industrial project in Kharoa Tangar, Patratu, Ramgarh, Jharkhand. The site covers 23 acres.
Who is building it?
The applicant is Sri Venkatesh Iron and Alloys India Limited.
Has it been approved?
No. The application was lapsed on 9 Feb 2025, so it is no longer under consideration.
Where is it?
In Kharoa Tangar, Patratu, Ramgarh, Jharkhand.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 23 acres.
When was it filed?
The application was filed on 31 Jan 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Feb 2025 |
| Application filed | 31 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Sri Venkatesh Iron and Alloys India Limited |
| Land area | 23 acres (9.3 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Kharoa Tangar |
| Taluk / tehsil | Patratu |
| District | Ramgarh |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-01158 |
In context
30 applications in Ramgarh since January 2022 are in the same category (Industry): 12 approved, 10 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 23 acres, this one is smaller than 53% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kharoa Tangar, Patratu, Ramgarh, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Production of sponge iron from 1,20,000 TPA to 1,80,000 TPA by… — lapsed, 50 m away
- Expansion in Production of sponge iron from 1,20,000 TPA to 1,80,000 TPA by… — cleared for impact study, 50 m away
- Expansion of 4x100 TPD DRI Unit by addition of 2x12T (245 TPD) Induction… — environmental approval granted, 100 m away
- Pali Stone Deposit — environmental approval granted, 2.8 km away
- Sirka Sand Deposit — environmental approval granted, 4.1 km away
- Sirka Sand Deposit — environmental approval granted, 4.1 km away
- Sirka Ocp — environmental approval granted, 4.4 km away
- Hehal Stone Quarry (Area- 0.63 ha.) — environmental approval granted, 5 km away
More from Sri Venkatesh Iron and Alloys India Limited in Ramgarh
- Expansion in Production of sponge iron from 1,20,000 TPA to 1,80,000 TPA by… — lapsed
- Expansion of 4x100 TPD DRI Unit by addition of 2x12T (245 TPD) Induction… — environmental approval granted
- Expansion in Production of sponge iron from 1,20,000 TPA to 1,80,000 TPA by… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.