Quick answers
What is this project?
Expansion in Production of sponge iron from 1,20,000 TPA to 1,80,000 TPA by adding of 2x100 TPD DRI unit and change in Technology from Induction Furnaces to Submerged Arc Furnaces (SAF) (12MVA*2) for the production of Fe-Si/ Fe-Mn/ Si-Mn/ Pig Iron- 64,000 TPA and additional 4 MW CPP ( WHRB) of M/s. Sri Venkatesh Iron & Alloys (India) Limited is a lapsed industrial project in Kharoa Tangar, Patratu, Ramgarh, Jharkhand. The site covers 28.2 acres.
Who is building it?
The applicant is Sri Venkatesh Iron and Alloys India Limited.
Has it been approved?
No. The application was lapsed on 19 Apr 2026, so it is no longer under consideration.
Where is it?
In Kharoa Tangar, Patratu, Ramgarh, Jharkhand.
How big is it?
It has a stated cost of ₹148 crore and a site of 28.2 acres.
When was it filed?
The application was filed on 26 Dec 2025.
Project details
| Official title | Expansion in Production of sponge iron from 1,20,000 TPA to 1,80,000 TPA by adding of 2x100 TPD DRI unit and change in Technology from Induction Furnaces to Submerged Arc Furnaces (SAF) (12MVA*2) for the production of Fe-Si/ Fe-Mn/ Si-Mn/ Pig Iron- 64,000 TPA and additional 4 MW CPP ( WHRB) of M/s. Sri Venkatesh Iron & Alloys (India) Limited, located at village Lapanga, P.O. Bhadaninagar, District Ramgarh, Jharkhand. |
|---|---|
| Status | Lapsed |
| Status since | 19 Apr 2026 |
| Application filed | 26 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Sri Venkatesh Iron and Alloys India Limited |
| Land area | 28.2 acres (11.4 ha) |
| Project cost | ₹148 crore |
| Village / locality | Kharoa Tangar |
| Taluk / tehsil | Patratu |
| District | Ramgarh |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-01617 |
In context
30 applications in Ramgarh since January 2022 are in the same category (Industry): 12 approved, 10 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 28.2 acres, this one is larger than 50% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kharoa Tangar, Patratu, Ramgarh, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Production of sponge iron from 1,20,000 TPA to 1,80,000 TPA by… — cleared for impact study, 0 m away
- Expansion in Production of sponge iron from 1,20,000 TPA to 1,44,000 TPA by… — lapsed, 50 m away
- Expansion of 4x100 TPD DRI Unit by addition of 2x12T (245 TPD) Induction… — environmental approval granted, 50 m away
- Pali Stone Deposit — environmental approval granted, 2.8 km away
- Sirka Sand Deposit — environmental approval granted, 4.1 km away
- Sirka Sand Deposit — environmental approval granted, 4.1 km away
- Sirka Ocp — environmental approval granted, 4.4 km away
- Hehal Stone Quarry (Area- 0.63 ha.) — environmental approval granted, 4.9 km away
More from Sri Venkatesh Iron and Alloys India Limited in Ramgarh
- Expansion of 4x100 TPD DRI Unit by addition of 2x12T (245 TPD) Induction… — environmental approval granted
- Expansion in Production of sponge iron from 1,20,000 TPA to 1,44,000 TPA by… — lapsed
- Expansion in Production of sponge iron from 1,20,000 TPA to 1,80,000 TPA by… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.