West Bokaro NOPR Township Project of Tata Steel Limited is an approved township project in Bhuiyadih, Mandu, Ramgarh, Jharkhand. It plans 400 units on 0.5 acres.
Who is building it?
The applicant is Tata Steel Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Jul 2025), as of 27 Nov 2026.
Where is it?
In Bhuiyadih, Mandu, Ramgarh, Jharkhand.
How big is it?
It has a stated cost of ₹350 crore and a site of 0.5 acres.
When was it filed?
The application was filed on 24 Apr 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Jul 2025 |
| Application filed | 24 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Tata Steel Limited |
| Use | Township |
| Units | 400 |
| Land area | 1,900 m² |
| Project cost | ₹350 crore |
| Village / locality | Bhuiyadih |
| Taluk / tehsil | Mandu |
| District | Ramgarh |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-01396 |
What the filings say
What is planned
Tata Steel Limited proposes to develop the West Bokaro NOPR Township Project, a residential colony with a total built-up area of 56,912.86 square metres. According to the conceptual plan, the project will consist of five residential building blocks, each with a configuration of Ground plus 10 floors (G+10). These blocks will house 400 dwelling units, all configured as 2 BHK (two-bedroom, hall, and kitchen) flats.
In addition to the residential blocks, the township will include:
- A community centre building (G+1) with a hall capacity for 150 persons.
- Shops and ATMs located on the ground floor.
- A recreational block featuring an indoor games room (30-person capacity), a gym hall, and a badminton court.
- Essential infrastructure including a maintenance office, a medical dispensary, and a security gate complex.
- Outdoor recreational facilities such as a children's park with a volleyball court, a playground, and a badminton court.
Layout and design
The project is planned on a plot area of 44,472.52 square metres, with 37,801.33 square metres considered for the project area. The ground coverage is 7,271.96 square metres (38.47%), while open spaces, including green cover, will occupy 8,325.94 square metres. The buildings will reach a height of 33.60 metres.
Internal connectivity will be provided through a network of paved and metal roads. The layout includes a 7.5-metre wide two-way internal driveway and 4.5-metre wide single carriage driveways. Pedestrian pathways of 1.5 metres width are also planned. Parking provisions include 451 spaces for four-wheelers, 400 for two-wheelers, six bus parking slots, and two ambulance parking spaces.
Land and surroundings
The site is located in Bhuyadih village, Mandu Tehsil, on land described as mostly barren with shrub vegetation. The applicant states the site is almost flat with a gentle slope of less than 6%. The nearest forest area is 660 metres away, and Lugu Pahar is located at a distance of 8.00 km. The Bokaro Nadi is 2.80 km from the site.
Nearby social infrastructure includes the Janta +2 High School (1 km), Tata DAV Public School (2.35 km), and the CCL Hospital (5.16 km). The project site is approximately 0.86 km from the NH-33 bypass and 1.5 km from the Chainpur Railway Station.
Water, power and access
Water Supply During the operational phase, the total water demand is estimated at 367.825 kilolitres per day (KLD). Fresh water requirement of 200.045 KLD will be sourced from the Tata Steel Water Supply System. The remaining 167.78 KLD will be met through treated water from an on-site Sewage Treatment Plant (STP) with a capacity of 300 KLD. This recycled water will be used for flushing (102.19 KLD), horticulture (33.87 KLD), and dust suppression (31.72 KLD).
Power The total power requirement is 3 MW, to be sourced from the Jharkhand Bijli Vitran Nigam Limited (JBVNL). The project does not plan for a power back-up system. Energy conservation measures, including LED lighting and solar street lights, are expected to save up to 20% of energy consumption. Approximately 1% of the total power demand will be met through renewable energy sources.
Environmental safeguards
The applicant proposes to install six rainwater harvesting pits to capture roof-top runoff. For waste management, the township is expected to generate 1,348.9 kg of municipal solid waste per day. This will be segregated into bio-degradable (40%) and non-biodegradable (60%) components. Bio-degradable waste will be treated in an Organic Waste Convertor (OWC) to be converted into fertilizer.
Storm water will be managed through a network of drains connected to a desilting tank before being discharged into the city drainage system. The project includes a landscape plan with tree plantation along the periphery and internal roads, covering 15% of the plot area.
| Item | Detail |
|---|---|
| Total Built-up Area | 56,912.86 sq. m. |
| Ground Coverage | 7,271.96 sq. m. (38.47%) |
| Total Residential Units | 400 (2 BHK) |
| Operational Population | 2,489 |
| Total Water Demand | 367.825 KLD |
| STP Capacity | 300 KLD |
| Power Requirement | 3 MW |
| Rainwater Harvesting Pits | 6 |
| Solid Waste Generation | 1,348.9 kg/day |
West Bokaro NOPR Township Project of Tata Steel Limited site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhuiyadih, Mandu, Ramgarh, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Change in Land Use Over 9.8866 Ha Diverted Forest Land — more information requested, 3 km away
- West Bokaro Coking Coal Washery of 10 MTPA Raw coal throughput in an area of… — lapsed, 3.5 km away
- Forest Diversion in 36.94 ha area of logistic corridor of West Bokaro, Tata… — under forest review, 3.6 km away
- Laiyo Sand Deposit (area 0.08 ha) — under environmental review, 3.8 km away
- Jharkhand Laiyo (Phase I) OCP — cleared for impact study, 6.3 km away
- Jhrakhand-Laiyo Ocp — lapsed, 6.3 km away
- Choritand Tilaiya Coal Mine — lapsed, 6.4 km away
- Kedla Opencast Project — environmental approval granted, 6.5 km away
More from Tata Steel Limited in Ramgarh
- Expansion of West Bokaro Opencast Mine — withdrawn
- Forest Diversion in 36.94 ha area of logistic corridor of West Bokaro, Tata… — under forest review
- Change in Land Use Over 9.8866 Ha Diverted Forest Land — more information requested
- West Bokaro Coking Coal Washery of 10 MTPA Raw coal throughput in an area of… — lapsed
5 Tata Steel projects in Ramgarh
All 104 Tata Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.