Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Oct 2024 |
| Application filed | 28 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Vertex Engineering |
| Forest land | 790 m² |
| Project cost | ₹64 lakh |
| Village / locality | Saidup R.F. |
| Taluk / tehsil | Barwadih |
| District | Latehar |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02332 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 28 May 2024 (this page) | Lapsed | ₹64 lakh | |
| New project filed 28 May 2024 | Lapsed | ₹64 lakh |
In context
6 applications in Latehar since January 2022 are in the same category (Telecom): 0 approved, 0 filed or under review, and 6 withdrawn, lapsed or rejected.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Saidup R.F., Barwadih, Latehar, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to RVNL Kumandih-Barwadih Railway Diversion: 18.5 km Railway Line in Latehar, Jharkhand (7.5 km away).
Other projects nearby
- ROW Permission for Ramkanda-Barwadih-Kotam — lapsed, 0 m away
- Airtel Fiber Project — lapsed, 0 m away
- Renovation of Harinamar M.I Scheme, Block-Barwadih, Dist-Latehar — more information requested, 1.1 km away
- Renovation of Harinamar M.I Scheme, Block-Barwadih, District-Latehar — decision issued, 1.1 km away
- Aspirational Project-Wildlife ROW clearance for Chhipadohar-Labhar Route — decision issued, 2.9 km away
- Aspirational project: Forest ROW clearance for Chhipadohar-Labhar Route — more information requested, 3.1 km away
- Diversion of 1.78 Hectare of Forest Land for construction of 6.500 Km PMGSY… — more information requested, 3.3 km away
- Strengthening -Widening & Reconstruction of Ked(SH-9) to Bhaisakharh via… — under forest review, 5.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.