One of 2 filings for this project. The project's main page, with every filing and where each stands: Kabribad OCP
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Jul 2023 |
| Application filed | 10 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Central Coalfields Limited |
| Land area | 224.5 acres (90.8 ha) |
| Forest land | 67.6 acres (27.4 ha) |
| Project cost | ₹32.9 crore |
| Village / locality | Chilga |
| Taluk / tehsil | Giridih |
| District | Giridih |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02376 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 24 Sept 2024 | Environmental approval granted | 224.5 acres | ₹32.9 crore |
| New project filed 10 Jan 2023 (this page) | Lapsed | 224.5 acres | ₹32.9 crore |
In context
84 applications in Giridih since January 2022 are in the same category (Mining): 66 approved, 9 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 224.5 acres, this one is larger than 96% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Chilga, Giridih, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kabribad OCP — environmental approval granted, 0 m away
- Brahmadiha Coal Mine for production of 0.5 MTPA Normative Coal through… — environmental approval granted, 2.6 km away
- Expansion of existing Rolling Mill from Production Capacity of TMT Bars -… — environmental approval granted, 3.1 km away
- Expansion of existing Rolling Mill from Production Capacity of TMT Bars -… — cleared for impact study, 3.1 km away
- Expansion in existing Rolling Mill to increase production from 250000TPA to… — more information requested, 3.2 km away
- Expansion in existing Rolling Mill to increase production from 250000TPA to… — cleared for impact study, 3.2 km away
- Environmental Clearance for Production of M.S Angle, Channel, Flats & Squares,… — lapsed, 3.6 km away
- Bypass Around Giridih Town of Nh-114a to 2 Lane With Paved Shoulder From Km 0… — more information requested, 4 km away
All 66 Central Coalfields projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.