Project details
| Status | Under wildlife review |
|---|---|
| Status since | 24 Aug 2023 |
| Application filed | 24 Aug 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Project cost | ₹50 lakh |
| Village / locality | Baresanr |
| Taluk / tehsil | Garu |
| District | Latehar |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02659 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Jan 2026 | Lapsed | 0 acres | ₹50 lakh |
| New project filed 24 Aug 2023 (this page) | Under wildlife review | 0 acres | ₹50 lakh |
In context
12 applications in Latehar since January 2022 are in the same category (Other): 0 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baresanr, Garu, Latehar, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G saturation Project for Vijaypur,Latehar,jharkhand(WC) — lapsed, 0 m away
- 4G saturation Project for Gopi Khonr,Latehar,Jharkhand ( WC) — more information requested, 4.2 km away
- Road from Barahi to Netarhat Road under Mahuadanr Block — lapsed, 8.4 km away
- 4g Saturation Project for Karihenar,latehar,jharkhand(Wc) — more information requested, 11.3 km away
- Construction and Maintanance of road from Latehar to Banari Via Gotag and 02… — lapsed, 14.2 km away
- HL RCC Bridge over Kuril River in between Garu to Heswa — under wildlife review, 20 km away
- Provision of 4g Based Mobile Services in Identified Uncovered Villages in… — more information requested, 22.8 km away
- High Level Bridge Over Tetuk Nala (Chainage 4.00 Km) and Brige Over Burha… — lapsed, 23.7 km away
More from Mahesh Nair in Latehar
- 4G saturation Project for Kurumkheta,Latehar ,Jharkhand(WC) — more information requested
- Jkd Meral 4g — more information requested
- 4G saturation Project for Kujrum ,Latehar,jharkhand(WC) — more information requested
- 4g Saturation Project for Karihenar,latehar,jharkhand(Wc) — more information requested
- 4G saturation Project for Gopi Khonr,Latehar,Jharkhand ( WC) — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.