Project details
| Official title | Construction of road from Barahi to Netarhat Road under Mahuadanr Block in Latehar District |
|---|---|
| Status | Lapsed |
| Status since | 18 Jul 2023 |
| Application filed | 4 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Deepak Kumar |
| Forest land | 8.8 acres (3.6 ha) |
| Project cost | ₹4.7 crore |
| Village / locality | Barahi |
| Taluk / tehsil | Mahuadanr |
| District | Latehar |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02600 |
In context
11 applications in Latehar since January 2022 are in the same category (Roads & highways): 0 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected.
Where it is
Barahi, Mahuadanr, Latehar, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G saturation Project for Vijaypur,Latehar,jharkhand(WC) — lapsed, 8.4 km away
- 4G saturation Project for Vijaypur,Latehar,jharkhand(WC) — under wildlife review, 8.4 km away
- 4G saturation Project for Gopi Khonr,Latehar,Jharkhand ( WC) — more information requested, 12.4 km away
- 4g Saturation Project for Karihenar,latehar,jharkhand(Wc) — more information requested, 16.7 km away
- Construction and Maintanance of road from Latehar to Banari Via Gotag and 02… — lapsed, 22.5 km away
- High Level Bridge Over Tetuk Nala (Chainage 4.00 Km) and Brige Over Burha… — lapsed, 25.3 km away
- High Level Bridge Over Tetuk Nala (Chainage 4.00 Km) and Brige Over Burha… — more information requested, 25.5 km away
- Reconstruction of Hami to Chhattisgarh via Orsa Kusami Road — lapsed, 25.9 km away
More from Deepak Kumar in Latehar
- HL RCC Bridge over Kuril River in between Garu to Heswa — under wildlife review
- Diversion of 1.78 Hectare of Forest Land for construction of 6.500 Km PMGSY… — more information requested
- Construction and Maintanance of road from Latehar to Banari Via Gotag and 02… — lapsed
- Construction of Road from Nawadih to Labhar — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.