Project details
| Status | More information requested |
|---|---|
| Status since | 5 Nov 2026 |
| Application filed | 18 Sept 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer, Road Construction Department, Road Division, Latehar |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹20.2 crore |
| Village / locality | Mangra |
| Taluk / tehsil | Garu |
| District | Latehar |
| State | Jharkhand |
| Location from | Site area on record |
| Our reference | WID-JH-02703 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Sept 2026 (this page) | More information requested | 2.5 acres | ₹20.2 crore |
| New project filed 27 Jan 2025 | Lapsed | 2.5 acres | ₹20.2 crore |
In context
11 applications in Latehar since January 2022 are in the same category (Roads & highways): 0 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected.
Where it is
Mangra, Garu, Latehar, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- High Level Bridge Over Tetuk Nala (Chainage 4.00 Km) and Brige Over Burha… — lapsed, 500 m away
- 4G saturation Project for Kujrum ,Latehar,jharkhand(WC) — more information requested, 7.3 km away
- Provision of 4g Based Mobile Services in Identified Uncovered Villages in… — more information requested, 8.8 km away
- Provision of 4g Based Mobile Services in Identified Uncovered Villages in… — lapsed, 8.8 km away
- 4g Saturation Project for Karihenar,latehar,jharkhand(Wc) — more information requested, 14.5 km away
- Jkd Meral 4g — more information requested, 14.8 km away
- Provision of 4g Based Mobile Services in Identified Uncovered Villages in… — more information requested, 15.9 km away
- HL RCC Bridge over Kuril River in between Garu to Heswa — under wildlife review, 17.3 km away
More from Executive Engineer, Road Construction Department, Road Division, Latehar in Latehar
- Strengthening -Widening & Reconstruction of Ked(SH-9) to Bhaisakharh via… — under forest review
- Strengthening -Widening & Reconstruction of Ked(SH-9) to Bhaisakharh via… — under wildlife review
- Reconstruction of Hami to Chhattisgarh via Orsa Kusami Road — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.