One of 2 filings for this project. The project's main page, with every filing and where each stands: Strengthening -Widening & Reconstruction of Ked(SH-9) to Bhaisakharh via Matang,…
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 4 Jun 2026 |
| Application filed | 4 Jun 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer, Road Construction Department, Road Division, Latehar |
| Project cost | ₹65.7 crore |
| Village / locality | Juruhar |
| Taluk / tehsil | Barwadih |
| District | Latehar |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02706 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Aug 2026 | Under forest review | ₹65.7 crore | |
| New project filed 4 Jun 2026 (this page) | Under wildlife review | ₹65.7 crore |
In context
11 applications in Latehar since January 2022 are in the same category (Roads & highways): 0 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Juruhar, Barwadih, Latehar, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to RVNL Kumandih-Barwadih Railway Diversion: 18.5 km Railway Line in Latehar, Jharkhand (2.7 km away).
Other projects nearby
- Strengthening -Widening & Reconstruction of Ked(SH-9) to Bhaisakharh via… — under forest review, 0 m away
- Diversion of the entire Railway network between Kumandih and Barwadih (18.5… — withdrawn, 2.7 km away
- Diversion of the entire Railway network between Kumandih and Barwadih (18.5… — not approved, 2.7 km away
- Diversion of the entire Railway network between Kumandih and Barwadih (18.5… — not approved, 2.7 km away
- Aspirational Project-Wildlife ROW clearance for Chhipadohar-Labhar Route — decision issued, 2.8 km away
- Aspirational project: Forest ROW clearance for Chhipadohar-Labhar Route — more information requested, 2.9 km away
- Diversion of Railway network between Kumandih and Barwadih from Palamau Tiger… — under wildlife review, 3.6 km away
- Diversion of the entire Railway network between Kumandih and Barwadih (18.5… — under forest review, 3.6 km away
More from Executive Engineer, Road Construction Department, Road Division, Latehar in Latehar
- High Level Bridge Over Tetuk Nala (Chainage 4.00 Km) and Brige Over Burha… — more information requested
- High Level Bridge Over Tetuk Nala (Chainage 4.00 Km) and Brige Over Burha… — lapsed
- Reconstruction of Hami to Chhattisgarh via Orsa Kusami Road — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.