What is Developing? Open the mapMap

WithdrawnMining · Pulwama, Jammu and Kashmir

Limestone Mineral an area of 4.42 ha; production capacity of 70980 TPA (ROM), Limestone Mineral

Limestone Mineral an area of 4.42 ha; production capacity of 70980 TPA (ROM), Limestone Mineral is a withdrawn mining project in Androsa, Pampore, Pulwama, Jammu and Kashmir. The site covers 10.9 acres. Its stated project cost is ₹5.8 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 15 Apr 2024).

See it on the live map All projects in Pulwama

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleLimestone Mineral an area of 4.42 ha; production capacity of 70980 TPA (ROM), Limestone Mineral at Village : Zaintrag, Tehsil: Pampore, District- Pulwama J&K (UT.) of Mr. Mohammad Sultan Mir.
StatusWithdrawn
Status since15 Apr 2024
Application filed3 Apr 2024
Approval soughtEnvironmental approval
Application typeValidity extension
SectorMining
ApplicantMohamad Mir
Land area10.9 acres (4.4 ha)
Project cost₹5.8 crore
Village / localityAndrosa
Taluk / tehsilPampore
DistrictPulwama
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00037

In context

15 applications in Pulwama since January 2022 are in the same category (Mining): 4 approved, 3 filed or under review, and 8 withdrawn, lapsed or rejected. At 10.9 acres, this one is smaller than 87% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 21.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.

Where it is

Androsa, Pampore, Pulwama, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Mohamad Mir in Pulwama

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.