Project details
| Official title | Limestone Mineral Mining Project (area of 4.42 ha; production capacity of 70980 TPA (ROM), Limestone Mineral at Village : Zaintrag, Tehsil: Pampore, District- Pulwama J&K (UT.)) |
|---|---|
| Status | Environmental approval granted |
| Status since | 5 Mar 2025 |
| Application filed | 5 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Mohamad Mir |
| Land area | 10.9 acres (4.4 ha) |
| Project cost | ₹2 crore |
| Village / locality | Androsa |
| Taluk / tehsil | Pampore |
| District | Pulwama |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00249 |
In context
15 applications in Pulwama since January 2022 are in the same category (Mining): 4 approved, 3 filed or under review, and 8 withdrawn, lapsed or rejected. At 10.9 acres, this one is smaller than 87% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 21.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Androsa, Pampore, Pulwama, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Limestone Mineral an area of 4.42 ha; production capacity of 70980 TPA (ROM),… — withdrawn, 0 m away
- Qutargan Zaintrag, Limestone Mining Project (area - 4.46 ha.) — environmental approval granted, 300 m away
- Qutargan Zaintrag, Limestone Mining Project (area - 4.46 ha.) — lapsed, 300 m away
- Expansion of Cement Plant capacity from 3.3 Lakhs TPA to 6.6 Lakhs TPA and… — initial checks, 1.3 km away
- Expansion of Cement Plant capacity from 3.3 Lakhs TPA to 6.6 Lakhs TPA and… — environmental approval granted, 1.3 km away
- Industrial project by Cemtac Cements PVT. LTD. — more information requested, 1.4 km away
- Limestone Mine (Ml 29.4151 Ha) of Riaz Ahmad Panjra With Maximum Production… — under environmental review, 1.7 km away
- Salinar Satur Marg Limestone Mine — more information requested, 1.7 km away
More from Mohamad Mir in Pulwama
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.