What is Developing? Open the mapMap

LapsedMining · Baramula, Jammu and Kashmir

Gypsum Mining Project, proposal for obtaining Environmental Clearance, Area of 4.39 ha; targeted Production capacity- 37025 TPA, in favor of M/s Baba Chemicals

Gypsum Mining Project, proposal for obtaining Environmental Clearance, Area of 4.39 ha; targeted Production capacity- 37025 TPA, in favor of M/s Baba Chemicals is a lapsed mining project in Boniyar, Baramula, Jammu and Kashmir. The site covers 10.8 acres. Its stated project cost is ₹4.6 crore. As of 27 Nov 2026, its status is “Lapsed” (since 3 Feb 2025).

See it on the live map All projects in Baramula

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since3 Feb 2025
Application filed9 Dec 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantAmir Khan
Land area10.8 acres (4.4 ha)
Project cost₹4.6 crore
Village / localityBoniyar
Taluk / tehsilBoniyar
DistrictBaramula
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00087

In context

26 applications in Baramula since January 2022 are in the same category (Mining): 3 approved, 3 filed or under review, and 20 withdrawn, lapsed or rejected. At 10.8 acres, this one is smaller than 54% of them.

No other mining lease on record is within 500 m of this site; 12 have applied within 5 km.

Where it is

Boniyar, Baramula, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Amir Khan in Baramula

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.