Project details
| Official title | Minor Mineral (Gypsum) Mining Project, proposal for obtaining Environmental Clearance of the Khasra No- 960 min, Area of 4.0128 ha; At village Bagna Tehsil Uri District Baramulla , J&K. U.T. in favor of M/S Tower Chemicals |
|---|---|
| Status | Lapsed |
| Status since | 30 Apr 2025 |
| Application filed | 24 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Tower chemicals |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹4.5 crore |
| Village / locality | Aithshm Pora (Theth Mulla Kallan) |
| Taluk / tehsil | Boniyar |
| District | Baramula |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00183 |
In context
26 applications in Baramula since January 2022 are in the same category (Mining): 3 approved, 3 filed or under review, and 20 withdrawn, lapsed or rejected. At 9.9 acres, this one is smaller than 88% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 56 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 13 mining leases have applied within 5 km.
Where it is
Aithshm Pora (Theth Mulla Kallan), Boniyar, Baramula, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/S Kohinoor Gypsum for Gypsum mining project, Khasra No- 960 min, Area of… — lapsed, 250 m away
- Minor Mineral (Gypsum) Mining Project, proposal for obtaining Environmental… — lapsed, 250 m away
- Minor Mineral (Gypsum) Mining Project, proposal for obtaining Environmental… — under environmental review, 400 m away
- Minor Mineral (Gypsum) Mining Project,Khasra No- 1093 minArea of 4.80 ha — not approved, 400 m away
- Gypsum Mining Project (Minor Mineral), Area of 4.39 ha — lapsed, 1 km away
- Gypsum Mining Project, proposal for obtaining Environmental Clearance, Area of… — lapsed, 1 km away
- Minor Mineral (Gypsum) Mining Project of of M/s Neelam Valley Gypsum — lapsed, 1.5 km away
- Minor Mineral (Gypsum) Mining Project, proposal for obtaining Environmental… — lapsed, 1.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.