Environmental approval grantedIndustry · Samba, Jammu and Kashmir

Expansion of the Existing Unit by Installing 01 No. Induction Furnace of 25 Tph Capacity and One Continuous Casting Machine at Sidco Industrial Estate, Bari Brahmana, Samba Jammu & Kashmir by M/S Kashmir Ispat for Production of 1,19,000 Tpa of Steel Ingots/Billets and to Enhance the Capacity of Rolling Mill to Increase the Production of Round, Angle, Channel, Tmt Bars and Flats From 85,876 Tpa to 1,13,050 Tpa.

Expansion of the Existing Unit by Installing 01 No. Induction Furnace of 25 Tph Capacity and One Continuous Casting Machine at Sidco Industrial Estate, Bari Brahmana, Samba Jammu & Kashmir by M/S Kashmir Ispat for Production of 1,19,000 Tpa of Steel Ingots/Billets and to Enhance the Capacity of Rolling Mill to Increase the Production of Round, Angle, Channel, Tmt Bars and Flats From 85,876 Tpa to 1,13,050 Tpa is an approved industrial project in Badori, Samba, Jammu and Kashmir. The site covers 5.9 acres. Its stated project cost is ₹32 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 19 Aug 2025).

See it on the live map All projects in Samba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since19 Aug 2025
Application filed12 Jul 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantKashmir Ispat
Land area5.9 acres (2.4 ha)
Project cost₹32 crore
Village / localityBadori
Taluk / tehsilSamba
DistrictSamba
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00115

In context

26 applications in Samba since January 2022 are in the same category (Industry): 12 approved, 2 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.9 acres, this one is larger than 69% of them.

14 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Badori, Samba, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Kashmir Ispat in Samba

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.