What is Developing? Open the mapMap

LapsedMining · Shupiyan, Jammu and Kashmir

Minor Minerals Block- No. 21, and Area 9.37 ha. (Resized area 4.90ha.) Ziarat Syed Rehmatullah Nazneenpora Upstream Nallah Rambiara District-Shopian, JK UT OF Shri Rakesh Kumar Choudhary S/O Shri Koula Ram

Minor Minerals Block- No. 21, and Area 9.37 ha. (Resized area 4.90ha.) Ziarat Syed Rehmatullah Nazneenpora Upstream Nallah Rambiara District-Shopian, JK UT OF Shri Rakesh Kumar Choudhary S/O Shri Koula Ram is a lapsed mining project in Adora Ram Pathri, Shopian, Shupiyan, Jammu and Kashmir. The site covers 23.1 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 9 Sept 2026).

See it on the live map All projects in Shupiyan

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Minor Minerals Block- No. 21, and Area 9.37 ha. (Resized area 4.90ha.) Ziarat Syed Rehmatullah Nazneenpora Upstream Nallah Rambiara District-Shopian, JK UT OF Shri Rakesh Kumar Choudhary S/O Shri Koula Ram is a lapsed mining project in Adora Ram Pathri, Shopian, Shupiyan, Jammu and Kashmir. The site covers 23.1 acres.

Who is building it?

The applicant is Shri Rakesh Kumar Choudhary S/O Shri Koul Ram.

Has it been approved?

No. The application was lapsed on 9 Sept 2026, so it is no longer under consideration.

Where is it?

In Adora Ram Pathri, Shopian, Shupiyan, Jammu and Kashmir.

How big is it?

It has a stated cost of ₹50 lakh and a site of 23.1 acres.

When was it filed?

The application was filed on 15 Feb 2024.

Project details

StatusLapsed
Status since9 Sept 2026
Application filed15 Feb 2024
Approval soughtEnvironmental approval
Application typeValidity extension
SectorMining
ApplicantShri Rakesh Kumar Choudhary S/O Shri Koul Ram
Land area23.1 acres (9.4 ha)
Project cost₹50 lakh
Village / localityAdora Ram Pathri
Taluk / tehsilShopian
DistrictShupiyan
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00172

In context

19 applications in Shupiyan since January 2022 are in the same category (Mining): 16 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected. At 23.1 acres, this one is larger than 79% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 30.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.

Where it is

Adora Ram Pathri, Shopian, Shupiyan, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Shri Rakesh Kumar Choudhary S/O Shri Koul Ram in Shupiyan

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.