Quick answers
What is this project?
River Bed Mineral Minor Minerals Block-No. 34, and Area 9.90 ha. Gaffar Bhat Sugan, Upstream Rambiara Nallah District-Shopian, JK UT OF Shri Rakesh Kumar Choudhary S/O Shri Koula Ram is an approved mining project in Molo, Shopian, Shupiyan, Jammu and Kashmir. The site covers 24.5 acres.
Who is building it?
The applicant is Shri Rakesh Kumar Choudhary S/O Shri Koul Ram.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Aug 2026), as of 27 Nov 2026.
Where is it?
In Molo, Shopian, Shupiyan, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹60 lakh and a site of 24.5 acres.
When was it filed?
The application was filed on 15 Feb 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Aug 2026 |
| Application filed | 15 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Shri Rakesh Kumar Choudhary S/O Shri Koul Ram |
| Land area | 24.5 acres (9.9 ha) |
| Project cost | ₹60 lakh |
| Village / locality | Molo |
| Taluk / tehsil | Shopian |
| District | Shupiyan |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00122 |
In context
19 applications in Shupiyan since January 2022 are in the same category (Mining): 16 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected. At 24.5 acres, this one is larger than 89% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 35.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Molo, Shopian, Shupiyan, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Block no.-03, C-Lassipora SIDCO bridge Downstream Nallah Rambaria… — lapsed, 400 m away
- Minor Mineral Block-33, House of Ab. Gaffar Bhat Sugun U/Stream Nallah… — environmental approval granted, 500 m away
- Minor Minerals Block 32 — environmental approval granted, 1.2 km away
- Manufacture of Formaldehyde ( Glues and Prepared Adhesives for Plyboard… — lapsed, 1.3 km away
- Minor Mineral Block No. 30 — environmental approval granted, 2.9 km away
- Minor Mineral Block No. 28 — environmental approval granted, 3.6 km away
- Minor Mineral River Bed Material (RBM) Mining Project Block No. 24, Sheikpora… — environmental approval granted, 6.3 km away
- Minor Mineral Block No. 22 — environmental approval granted, 7.3 km away
More from Shri Rakesh Kumar Choudhary S/O Shri Koul Ram in Shupiyan
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.