What is Developing? Open the mapMap

LapsedMining · Baramula, Jammu and Kashmir

Gypsum Mining Project (Minor Mineral), Proposal for re-appraisal of obtaining Environmental Clearance of the Khasra No- 142, 141, 139, 138, 137, 136, 144, 483/145, 513/145, 131, 134, 514/147, 659/145, 135, 133, 143, Area of 4.18 ha

Gypsum Mining Project (Minor Mineral), Proposal for re-appraisal of obtaining Environmental Clearance of the Khasra No- 142, 141, 139, 138, 137, 136, 144, 483/145, 513/145, 131, 134, 514/147, 659/145, 135, 133, 143, Area of 4.18 ha is a lapsed mining project in Darah Gutliyan, Boniyar, Baramula, Jammu and Kashmir. The site covers 10.3 acres. Its stated project cost is ₹5 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 30 Apr 2026).

See it on the live map All projects in Baramula

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Gypsum Mining Project (Minor Mineral), Proposal for re-appraisal of obtaining…

Project details

Official titleGypsum Mining Project (Minor Mineral), Proposal for re-appraisal of obtaining Environmental Clearance of the Khasra No- 142, 141, 139, 138, 137, 136, 144, 483/145, 513/145, 131, 134, 514/147, 659/145, 135, 133, 143, Area of 4.18 ha., at village Dara Gutliyan, Tehsil Uri, District Baramulla, J&K. U.T. in favor of Shri Syed Mohammad Tahir.
StatusLapsed
Status since30 Apr 2026
Application filed30 Oct 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantSyed Mohd Tahir
Land area10.3 acres (4.2 ha)
Project cost₹5 lakh
Village / localityDarah Gutliyan
Taluk / tehsilBoniyar
DistrictBaramula
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00182

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 30 Oct 2025 (this page)Lapsed10.3 acres₹5 lakh
New project filed 28 May 2025Not approved10.3 acres₹5 lakh

In context

26 applications in Baramula since January 2022 are in the same category (Mining): 3 approved, 3 filed or under review, and 20 withdrawn, lapsed or rejected. At 10.3 acres, this one is smaller than 73% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 32 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 15 mining leases have applied within 5 km.

Where it is

Darah Gutliyan, Boniyar, Baramula, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.