Project details
| Official title | Minor Mineral (Gypsum) Mining Project Khasra No- 144,585/145,649/145,507/145,147,623/157,157 min, Area of 4.43 ha; At Village Dara Gutliyan Tehsil Uri District Baramulla J&K. U.T |
|---|---|
| Status | Not approved |
| Status since | 15 Jul 2025 |
| Application filed | 18 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shabir Ahmad Bhat |
| Land area | 10.9 acres (4.4 ha) |
| Project cost | ₹5.3 crore |
| Village / locality | Biji Hama |
| Taluk / tehsil | Boniyar |
| District | Baramula |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00274 |
In context
26 applications in Baramula since January 2022 are in the same category (Mining): 3 approved, 3 filed or under review, and 20 withdrawn, lapsed or rejected. At 10.9 acres, this one is larger than 54% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 42.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.
Where it is
Biji Hama, Boniyar, Baramula, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Minor Mineral (Gypsum) Mining Project Khasra No- 144,585/145,649/145,507/145,14… — lapsed, 0 m away
- Gypsum Mining Project (Minor Mineral), Proposal for re-appraisal of obtaining… — lapsed, 150 m away
- Gypsum Mining Project (Minor Mineral), Proposal for re-appraisal of obtaining… — not approved, 150 m away
- Minor Mineral (Gypsum) Mining Project Khasra No- 141,138,139,119,626/117,140,11… — not approved, 300 m away
- Minor Mineral Gypsum Mining Project (At khasra no.- 95/145, 655/145, 498/145,… — lapsed, 350 m away
- Minor Mineral (Gypsum) Mining Project, proposal for obtaining Environmental… — lapsed, 1.8 km away
- M/S Snow white Gypsum for Gypsum mining project, Area of 4.09 ha. at Khasra… — not approved, 1.8 km away
- WSS MuqamPeeran-Mayan-Braripora-Bijhama — lapsed, 3 km away
More from Shabir Ahmad Bhat in Baramula
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.