Quick answers
What is this project?
River Bed Material in Block No.07, Thathi Nallah Downstream Thathi Bridge,Tehsil & District-Udhampur State- Jammu & Kashmir is an approved mining project in Rakh Nehranal (Un-Inhabited), Udhampur, Jammu and Kashmir. The site covers 9.2 acres.
Who is building it?
The applicant is Kapil Aggarwal.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Feb 2025), as of 27 Nov 2026.
Where is it?
In Rakh Nehranal (Un-Inhabited), Udhampur, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹1 crore and a site of 9.2 acres.
When was it filed?
The application was filed on 18 Feb 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Feb 2025 |
| Application filed | 18 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Kapil Aggarwal |
| Land area | 9.2 acres (3.7 ha) |
| Project cost | ₹1 crore |
| Village / locality | Rakh Nehranal (Un-Inhabited) |
| Taluk / tehsil | Udhampur |
| District | Udhampur |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00258 |
In context
14 applications in Udhampur since January 2022 are in the same category (Mining): 10 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 9.2 acres, this one is smaller than 86% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Rakh Nehranal (Un-Inhabited), Udhampur, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G saturation USO — lapsed, 2.2 km away
- 4G Saturation Project Khandrah — forest land use approved, 2.2 km away
- Construction of L026 (Link Road) Nadi Talab to Khandra — initial checks, 2.3 km away
- Overhead Ofc Laying Route Through Forest Area Upto Kandrah 4g Saturation Site — forest land use approved, 2.6 km away
- Improvement and Augmentation of Water Supply Scheme Tikri(Jjm) — lapsed, 3.3 km away
- Improvement and Augmentation of Water Supply Scheme Tikri(Jjm) — forest land use approved, 3.3 km away
- USO 4G saturation project — lapsed, 3.6 km away
- WSS Mand — lapsed, 3.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.