Quick answers
What is this project?
Overhead Ofc Laying Route Through Forest Area Upto Kandrah 4g Saturation Site is an approved telecom project in Khandrah, Udhampur, Jammu and Kashmir. The site covers 0.2 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 8 Oct 2025), as of 27 Nov 2026.
Where is it?
In Khandrah, Udhampur, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹12 lakh; a site of 0.2 acres and 250 m² of forest land.
When was it filed?
The application was filed on 13 Jan 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 8 Oct 2025 |
| Application filed | 13 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 700 m² |
| Forest land | 250 m² |
| Project cost | ₹12 lakh |
| Village / locality | Khandrah |
| Taluk / tehsil | Udhampur |
| District | Udhampur |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02095 |
In context
40 applications in Udhampur since January 2022 are in the same category (Telecom): 27 approved, 3 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0.2 acres, this one is larger than 85% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khandrah, Udhampur, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation Project Khandrah — forest land use approved, 650 m away
- 4G saturation USO — lapsed, 650 m away
- Construction of L026 (Link Road) Nadi Talab to Khandra — initial checks, 700 m away
- Improvement and Augmentation of Water Supply Scheme Tikri(Jjm) — lapsed, 2.2 km away
- Improvement and Augmentation of Water Supply Scheme Tikri(Jjm) — forest land use approved, 2.2 km away
- River Bed Material in Block No.07, Thathi Nallah Downstream Thathi… — environmental approval granted, 2.6 km away
- WSS Mand — lapsed, 3.5 km away
- WSS Mand — forest land use approved, 3.5 km away
More from Mahesh Nair in Udhampur
- 4G Saturation Project at Alu Top — more information requested
- 4G Saturation Project Kandal — forest land use approved
- 4G Saturation Project Lower Bali — forest land use approved
- 4G Saturation Project - Kossar — more information requested
- 4G Saturation Project KOSSAR — lapsed
- 4g Saturation Project Kossar — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.