Quick answers
What is this project?
Minor Mineral (River Bed Material) Mining Project Block-04, Under Construction Bridge to Arch Downstream Sindh River, Village Arch, Tehsil -Arch, District -Ganderbal, J&K is a lapsed mining project in Bena Hama, Lar, Ganderbal, Jammu and Kashmir. The site covers 14.8 acres.
Who is building it?
The applicant is Riyaz Ahmed.
Has it been approved?
No. The application was lapsed on 7 Jul 2026, so it is no longer under consideration.
Where is it?
In Bena Hama, Lar, Ganderbal, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹2 crore and a site of 14.8 acres.
When was it filed?
The application was filed on 7 Jul 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 7 Jul 2026 |
| Application filed | 7 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Riyaz Ahmed |
| Land area | 14.8 acres (6 ha) |
| Project cost | ₹2 crore |
| Village / locality | Bena Hama |
| Taluk / tehsil | Lar |
| District | Ganderbal |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00315 |
In context
No other mining lease on record has applied within 5 km of this site.
Where it is
Bena Hama, Lar, Ganderbal, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Road From Km 4th Of Lar Waliwar Road To Tragbal at Lar Ganderbal — not approved, 3.2 km away
- Water Supply Scheme Chantan Gulabpora Waliwar — forest land use approved, 3.6 km away
- Road from Chuntwaliwar to Mohan Marg Lal Marg RD 3500 to RD 12000 at Lar… — not approved, 5 km away
- Road from Chuntwaliwar to Mohan Marg Lal Marg RD 3500 to RD 12000 at Lar… — not approved, 5 km away
- Construction/Development of the permanent Campus for Central University of… — under environmental review, 5.2 km away
- 93 MW New Ganderbal Hydro Electric Project — returned to applicant, 5.6 km away
- 4G Saturation Project Yarmukam — forest land use approved, 6.4 km away
- Balance Portion of Pedestrain Walk path from Kondbal onwards Phase-Ist — lapsed, 7.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.