Quick answers
What is this project?
Balance Portion of Pedestrain Walk path from Kondbal onwards Phase-Ist is a lapsed road project in Ahan, Lar, Ganderbal, Jammu and Kashmir. The site covers 2.3 acres.
Who is building it?
The applicant is Chief Engineer Pwd (R&b) Kashmir.
Has it been approved?
No. The application was lapsed on 7 May 2024, so it is no longer under consideration.
Where is it?
In Ahan, Lar, Ganderbal, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹18.8 crore; a site of 2.3 acres and 2.3 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 6 Jan 2024.
Project details
| Official title | Development of Balance Portion of Pedestrain Walk path from Kondbal onwards Phase-Ist |
|---|---|
| Status | Lapsed |
| Status since | 7 May 2024 |
| Application filed | 6 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Chief Engineer Pwd (R&b) Kashmir |
| Land area | 2.3 acres (0.9 ha) |
| Forest land | 2.3 acres (0.9 ha) |
| Project cost | ₹18.8 crore |
| Village / locality | Ahan |
| Taluk / tehsil | Lar |
| District | Ganderbal |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02110 |
In context
10 applications in Ganderbal since January 2022 are in the same category (Roads & highways): 1 approved, 2 filed or under review, and 7 withdrawn, lapsed or rejected. At 2.3 acres, this one is smaller than 90% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ahan, Lar, Ganderbal, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction/Development of the permanent Campus for Central University of… — under environmental review, 4 km away
- Road From Km 4th Of Lar Waliwar Road To Tragbal at Lar Ganderbal — not approved, 4.9 km away
- Water Supply Scheme Chantan Gulabpora Waliwar — forest land use approved, 5.7 km away
- Minor Mineral (River Bed Material) Mining Project Block-04, Under Construction… — lapsed, 7.3 km away
- Road from Chuntwaliwar to Mohan Marg Lal Marg RD 3500 to RD 12000 at Lar… — not approved, 8.1 km away
- Road from Chuntwaliwar to Mohan Marg Lal Marg RD 3500 to RD 12000 at Lar… — not approved, 8.1 km away
- 50 mtr Span Steel Girder Pahribal-Takanwari Bridge over Nallah Sindh at… — lapsed, 10.5 km away
- 4G Saturation Project Yarmukam — forest land use approved, 11 km away
More from Chief Engineer Pwd (R&b) Kashmir in Ganderbal
- Road from Chuntwaliwar to Mohan Marg Lal Marg RD 3500 to RD 12000 at Lar… — not approved
- Road from Chuntwaliwar to Mohan Marg Lal Marg RD 3500 to RD 12000 at Lar… — not approved
- 50 mtr Span Steel Girder Pahribal-Takanwari Bridge over Nallah Sindh at… — lapsed
- Road From Km 4th Of Lar Waliwar Road To Tragbal at Lar Ganderbal — not approved