What is Developing? Open the mapMap

Environmental approval grantedMining · Punch, Jammu and Kashmir

Minor Mineral Block (River Bed Material) Block 10, an area of 4.60 ha; Nallah Betar, Downstream Betar Bridge, District Poonch, JK UT in favor of Shri Tejinder Pal S/O Sh. Harbhajan Singh

Minor Mineral Block (River Bed Material) Block 10, an area of 4.60 ha; Nallah Betar, Downstream Betar Bridge, District Poonch, JK UT in favor of Shri Tejinder Pal S/O Sh. Harbhajan Singh is an approved mining project in Ajot, Haveli, Punch, Jammu and Kashmir. The site covers 11.4 acres. Its stated project cost is ₹1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 20 May 2026).

See it on the live map All projects in Punch

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since20 May 2026
Application filed20 May 2026
Approval soughtEnvironmental approval
Application typeValidity extension
SectorMining
ApplicantTejinder Pal Singh
Land area11.4 acres (4.6 ha)
Project cost₹1 crore
Village / localityAjot
Taluk / tehsilHaveli
DistrictPunch
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00322

In context

14 applications in Punch since January 2022 are in the same category (Mining): 13 approved, 1 filed or under review, and 0 withdrawn, lapsed or rejected. At 11.4 acres, this one is smaller than 57% of them.

No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.

Where it is

Ajot, Haveli, Punch, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.