Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 May 2026 |
| Application filed | 20 May 2026 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Kirti Pal Sharma |
| Land area | 20.8 acres (8.4 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Mangnar |
| Taluk / tehsil | Haveli |
| District | Punch |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00372 |
In context
14 applications in Punch since January 2022 are in the same category (Mining): 13 approved, 1 filed or under review, and 0 withdrawn, lapsed or rejected. At 20.8 acres, this one is larger than 71% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Mangnar, Haveli, Punch, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Minor Mineral (River Bed material) Project at Block – 08 having an area of… — environmental approval granted, 1.3 km away
- Minor Mineral Block (River Bed Material) Block 10, an area of 4.60 ha; Nallah… — environmental approval granted, 1.6 km away
- 4G Saturation Project Dalan — more information requested, 2.5 km away
- Const. of road Moh. Ghai via City Forest Part 1st — lapsed, 2.8 km away
- Diversion of 0.002529 Ha of Forest Land — lapsed, 3.2 km away
- 4G Saturation Project Khari Dharasal — forest land use approved, 3.4 km away
- 4G Saturation Project Banwat Upper — forest land use approved, 3.8 km away
- Wss Gundi Naiyan Banpat — more information requested, 4.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.