What is Developing? Open the mapMap

LapsedMining · Shupiyan, Jammu and Kashmir

Block no.-03, C-Lassipora SIDCO bridge Downstream Nallah Rambaria Village-Lassipora, Tehsil-Litter, District-Pulwama, and State/UT- J&K

Block no.-03, C-Lassipora SIDCO bridge Downstream Nallah Rambaria Village-Lassipora, Tehsil-Litter, District-Pulwama, and State/UT- J&K is a lapsed mining project in Sugan, Shopian, Shupiyan, Jammu and Kashmir. The site covers 10.8 acres. Its stated project cost is ₹2.5 crore. As of 27 Nov 2026, its status is “Lapsed” (since 20 Nov 2026).

See it on the live map All projects in Shupiyan

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Block no.-03, C-Lassipora SIDCO bridge Downstream Nallah Rambaria Village-Lassipora, Tehsil-Litter, District-Pulwama, and State/UT- J&K is a lapsed mining project in Sugan, Shopian, Shupiyan, Jammu and Kashmir. The site covers 10.8 acres.

Who is building it?

The applicant is Khursheed Mir.

Has it been approved?

No. The application was lapsed on 20 Nov 2026, so it is no longer under consideration.

Where is it?

In Sugan, Shopian, Shupiyan, Jammu and Kashmir.

How big is it?

It has a stated cost of ₹2.5 crore and a site of 10.8 acres.

When was it filed?

The application was filed on 20 Jul 2026.

Project details

StatusLapsed
Status since20 Nov 2026
Application filed20 Jul 2026
Approval soughtEnvironmental approval
Application typeValidity extension
SectorMining
ApplicantKhursheed Mir
Land area10.8 acres (4.4 ha)
Project cost₹2.5 crore
Village / localitySugan
Taluk / tehsilShopian
DistrictShupiyan
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00332

In context

19 applications in Shupiyan since January 2022 are in the same category (Mining): 16 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected. At 10.8 acres, this one is smaller than 53% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 58.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.

Where it is

Sugan, Shopian, Shupiyan, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.